Installation Guide
9.3 Testing the Fans
You can verify the operation of the fans in two ways:
• Set the parameter “Fan Test“ to "1" (with Sunny Data, Sunny Data Control or with the data
logger Sunny Boy Control).
or
• Turn off the inverter by turning off all DC and AC disconnects and wait 5 minutes for any residual
voltages to dissipate.
• Once the LED’s are off, remove the cover and set the jumpers as shown in the figure below.
• Turn on the inverter by turning on the AC disconnect and then the DC disconnect or switch the
SMA DC-Disconnect to the "1" position.
Jumper Position for Fan Test
Jumper Position for verifiying the
operation of the fans
Содержание SUNNY BOY 8000-US
Страница 2: ......
Страница 10: ...SMA Solar Technology AG 10 SB50US 80US IUS094030 Installation Guide...
Страница 29: ...SMA Solar Technology AG Installation Guide SB50US 80US IUS094030 29 Dimensions of the Wall Mounting Bracket...
Страница 105: ...SMA Solar Technology AG Installation Guide SB50US 80US IUS094030 105...
Страница 106: ...SMA Solar Technology AG 106 SB50US 80US IUS094030 Installation Guide...
Страница 107: ......
Страница 108: ...4 NFSJDB ODPSQPSBUFE XXX TNB BNFSJDB DPN...