![SMA CLUSTER CONTROLLER Скачать руководство пользователя страница 69](http://html1.mh-extra.com/html/sma/cluster-controller/cluster-controller_user-manual_1294244069.webp)
• Select the group
Settings of analog inputs
.
• In the field
Failure tolerance time
, enter the desired time interval.
• In the field
Initial value input signal
, enter the desired value.
• In the field
Final value input signal
, enter the desired value.
• In the field
Start setpoint reactive power
, enter the desired value.
• In the field
End setpoint reactive power
, enter the desired value.
8. When using the digital inputs, set the status configuration:
• Select the group
Status configuration
.
• Depending on the number of digital inputs used in the column
Active
, activate the
selection field of the status to be configured in each case.
• In the column
Reactive power
, enter the desired value for the status to be configured in
each case.
9. Make the settings for the fallback (see Section 13.5, page 70).
13.4.2 Controlling Reactive Power via the Setpoint "cos Phi"
If you select the displacement power factor cos φ as the reactive power setpoint, the cosine function
of the phase shift angle between the current and the voltage is used as setpoint.
Input signals up to 21 mA possible
For an analog signal source, the Cluster Controller classifies input signals as valid up to a
maximum of 21 mA. This enables intentional overload to ensure that the maximum setpoint is
reached.
Requirements:
☐ The configuration for the reactive power setpoint must be agreed upon with the responsible
grid operator.
☐ The required parameter for the reactive power setpoint must be configured in the inverter (see
Procedure:
1. Log into the Cluster Controller as
Installer
.
2. In the system tree, select the Cluster Controller and select the menu
Grid management
services
in the device menu.
3. Make the general settings:
• Select the parameter group
General settings > System control
.
• Select [
Edit
].
• In the drop-down list
Operating mode
, select the entry
Open-loop control
.
• If you are using digital or analog inputs, enter the desired time interval in the field
Time
interval for the output value
.
4. Select the parameter group
Reactive power
and select [
Edit
].
5. Make the basic settings in the group
Basic settings
:
13 Grid Management Services
SMA Solar Technology AG
User Manual
69
ClusterController-BA-en-15
Содержание CLUSTER CONTROLLER
Страница 1: ...User Manual SMA CLUSTER CONTROLLER ClusterController BA en 15 Version 1 5 ENGLISH...
Страница 113: ......
Страница 114: ...SMA Solar Technology www SMA Solar com...