ELECTRONIC CONTROL PANEL
Page 7
Picture 7
symbol
button
function
SCROLL
to advance to the next
parameter
UP
to increase the value of the
parameter
DOWN
to decrease the value of the
parameter
POWER-UP
After power-up, the display will show the installed software
version for 5 seconds, f.e.:
Afterwards it will automatically revert back to the service
display.
POWER FAILURE
In the event of a power failure, the program will remain
stored in the NOVRAM® during an undefined period, while
an incorporated SuperCap (capacitor) will maintain the
correct time of day during a period of several hours;
consequently, in case of prolonged power failure, the time
of day might not be maintained; if this happens, the time of
day will be reset to 8:00 when the power supply is re-
established, while the indication will
flash
, indicating that
the time of day needs to be set.
When the power failure occurs during the execution of an
automatic regeneration, the control valve will immediately
return to the service position; when the power supply is re-
established, the control valve will stay in the service position
for 60 sec. and restart a complete regeneration from the
beginning.
TIMER FAILURE
In the event of a timer failure, the display will show the
message:
In such case, entering one of the programming levels can
possibly solve the problem. However if the problem persists,
professional service is required.
SERVICE MODE
In
service mode
the
display shows the time of day, the
remaining capacity and the water usage indicator:
REGENERATION MODE
In
regeneration mode
the
display shows the actual
regeneration cycle and, where relevant, the total remaining
regeneration time and remaining cycle time:
The control valve can be
reset to service mode
at any time
by pressing the
scroll
button, as such manually advancing
it through the regeneration cycles.
CHECKING THE FLOW METER
In case of water usage, the remaining capacity counter in the
service display will count back per unit, i.e. per litre. This way
the correct functioning of the water meter can be verified.
MANUAL REGENERATION
It is possible to manually initiate a regeneration.
1.
Press the
scroll
button repeatedly until the display
shows:
If the control valve is left in this position, the
countdown timer will countdown to 0 sec and
start a
regeneration.
To cancel this mode, press the
scroll
button
before the countdown timer has reached 0 sec; the
control valve will return to the service mode.
2.
Press the
scroll
button again if you want to manually
advance the control valve to the next regeneration cycle.
EZ3P5e EZ3PB r11
8:00
1000L -
Service Required
20:51 1000L -
BRINE FILL
REGEN PENDING
Rgn:XXX CycY:ZZZ
Regen in 10 sec
Содержание Eco 17L
Страница 1: ...2013 Aquion Inc TM EN Slimline Rev2013 08 Technical Manual WATER SOFTENER...
Страница 12: ...HYDRAULIC FLOW DIAGRAMS ECO Page 12 SERVICE REFILL BRINE PREPARATION BRINE DRAW SLOW RINSE...
Страница 13: ...HYDRAULIC FLOW DIAGRAMS ECO Page 13 SERVICE REFILL BRINE PREPARATION BACKWASH BRINE DRAW SLOW RINSE FAST RINSE...
Страница 18: ...EXPLODED VIEW SLIMLINE 11L 14L Page 18...
Страница 20: ...EXPLODED VIEW SLIMLINE 17L 24L 30L Page 20...
Страница 22: ...EXPLODED VIEW VALVE BODY ASSEMBLY ECO Page 22...
Страница 24: ...EXPLODED VIEW VALVE BODY ASSEMBLY ECO Page 24...
Страница 27: ...Page 27...
Страница 30: ...Page 30...
Страница 31: ...Page 31...
Страница 33: ...2012 Aquion Inc PP SlimlineEco Rev2012 05 r 1 2 3 a 3 b...
Страница 34: ...2012 Aquion Inc PP SlimlineEco Rev2012 05 r 4 a 4 b 5 a 5 b r 6...
Страница 35: ...2012 Aquion Inc PP SlimlineEco Rev2012 05 r 7 8 a r 8 b r 8 c...
Страница 36: ...2012 Aquion Inc PP SlimlineEco Rev2012 05 r 9 a 9 b 9 c r 10...