Installation Checklist
Start-up checks Actuators
�..........
Actuator Manual Decouple Valve Tight.
�..........
Check Electric operated decouple valve (coil nut) is tightened Under 6.8-9.5 Nm.
�.......... Check hose spec from combiner to fi n valve(Less than 2.5m)(Recommended).
�..........
Actuator Hose Connections Tight/Clear Port/Stb.
�..........
Hoses have full range of movement.
*excluding SPS-B 55
�.......... Cylinder rods clean, and without damages/scratches
.
�..........
Actuator Electrical Connections Clear.
�..........
Actuator Encoder Belt, Wheels ok and Belt Tight.
�..........
Actuator Bonded to the boats electrical system.
�..........
Actuators clear of Boat Structure.
Start-up checks Fin valve unit
�..........
Fin Valve Manual Decouple Valve Tight.
�..........
Fin Valve Check Hose Connections Port/Stb.
�..........
Fin Valve Electrical Connections Correct.
Start-up checks Accumulator block
�..........
Accumulator Block Manual Decouple Valve Tight.
�..........
Accumulator Block Hose Connections Ok.
�..........
Accumulator Block Electrical Connections Correct.
�..........
Accumulator Pressure Transmitter Reading Correct.
Start-up checks Electrical components
�..........
Check
Power
Feed
is
Active.
�..........
SCU and FCU Electrical Connections.
�..........
GW-1 and GPS Connections Correct and Valid Signal.
Start-up checks Cooling pump
Electric:
�..........
PHC-3 settings. See PHC-3 manual.
�..........
Check Cooling pump connections are correct and pump runs in correct direction.
Hydraulic:
�..........
PHC-3 settings. See PHC-3 manual.
�..........
Check connections and drive direction