
46
5251
5
2022
-
SPS-B
Fin Installation
8. When handling the fi n assembly, ensure enough manpower is available to assist with the careful insertion and alignment positioning avoiding any
unnecessary damage to the shaft.
- Lift the correct handed fi n assembly in the appropriate direction and insert the fi n shaft into the actuator.
- Fit two nuts with washers back onto the securing bolts opposite each other to prevent the fi n from falling.
9. Remove both oil port plugs from where the shaft enters the fi n.
MC_0219
MG_0245
Pin Bolt
Special Locking Washer
Nut
IMPORTANT
Lubricate the bolt threads with
Molykote/ grease
Remove both oil port plugs
8
9
Fin Installation
10. Assemble the high-pressure pump according to the manual included with the pump.
a. Connect the high-pressure hose.
b. Fill up the container with oil.
c. Use the pump to bleed out the air in the hose.
d. When free oil flows connect the hose to the shaft ON fi tting.
e. Fitting to shaft
11. Lock the actuator cylinders in its absolute setting then also position the fi n as far outboard as possible without hitting the outer edge of the hull.
MC_0219
Содержание VECTOR FINS VF650
Страница 66: ...66 5251 5 2022 SPS B MC_0037 Notes...
Страница 67: ...67 5251 5 2022 SPS B MC_0037 Notes...