
28
5251
5
2022
-
SPS-B
MG_0229
+12/24V
2A
End terminator
red
yellow
black
End terminator
S-link supply
S-link
Power
supply
cable
A
GPS
receiver
Panel Power
Supply cable
Reverse
detection
cable
DC power supply
24V/15A
FCU
FCU
Fin valve
unit
Fin valve
unit
VFD
Cooling
pump
Powerpack
PHC-3
Gear(s)
Actuator
PT
Actuator
STB
SCU
GW
-
1
Panel
TP-43A
S
-
link
Encoder
Encoder
1
4
2
SCU Power
Supply cable
3
Encoder
cable
5
Encoder
cable
5
FCU
Harness
6
FCU
Harness
6
SCU-FCU
cable
7
SCU-FCU
cable
7
VFD BUS
cable
8
Pump
Power cable
Relay Box
10
PHC-3 X1
Harness
9
Power supply
9-31V/2A
Other
options
Other
options
Gianneschi pump
Power supply
24V/10A
Controller
Power supply
24V/10A
Other
options
NMEA 2000 if not reverse
detection switches used(e.g
IPS drives)
Reverse
detection loop
(Ship yard)
4b
Reverse
solenoid
interface
(Option)
Electrical Installation
Содержание VECTOR FINS VF650
Страница 66: ...66 5251 5 2022 SPS B MC_0037 Notes...
Страница 67: ...67 5251 5 2022 SPS B MC_0037 Notes...