Page 10 of 56
SKIPPER
Electronics AS
Edition: 2021-09-16
ESN100 Operation and Installation Manual
Chapter: Introduction and Specification
Communication cable ESN100-SB to JB50E1-SA
The communication between Operator display unit ESN100-SB and Transceiver unit JB50E1-SA is a one pair
cable, two way communication, RS485. See below drawing for specs.
JB50E1-SA
Shield grounded
to gland (PG13,5)
Shield grounded
to chassis
Power input (24VDC)
NMEA IN 2
RS485 JB50
GND
(NMEA OUT 2)
NMEA OUT 1
NMEA IN 1
B+
A -
B+
A -
B+
A -
B+
A -
RS485 Display
J3
A -
B +
+
-
CN1
Thickness: min.0,325mm2, max. 1,5mm2
Lenght: Max. 500m
Cable: RS485, baud rate 115200
1-pair twisted and shielded
2
1
1
2
3
4
5
6
7
8
9
10
11
12
E
F
C
1
2
3
4
B
A
3
2
1
5
C
D
4
6
7
8
A
B
D
E
ISO2768m
Gen. tolerance
Eur. projection
Drwg. no.
Name
Edition date
Sheet
Revision
Scale
Designed by - date
Approved by - date
Electronics AS
Wiring Diagram ESN100-SB
to JB50E1-SA
CD-2040-B
01
1 of 1
2020.08.27
2017.04.26 ST
2017.04.26 GT
Rev 01. Changed J3 Pin 1 to
B+
and pin 2 to A-. Renamed to
CD-2040-B ST 2020.08.27
Clamping the cables
Cables should be connected to WAGO connector, leaving approximately
3 cm of tail. They should be stripped with 6-7 mm of metal showing and
these should be connected as in the diagram above. A small screwdriver
with blade size approx 3.5 mm can be used. WAGO part no 210-719
is
ideal for this use.
Outer shields should be collected and grounded in a ground stud on the
edge of the cabinet. The outer insulation should be cable tied to the plastic
handle of the connector, and securely anchored nearby. The plugs when re-
fitted, must be installed such that their clips are fully in the up position.