10
EN
10. Maintenance
- 67 -
951-181-014-EN
Version 16
Checklist maintenance of ELNOR motors
Activity to be done
Interval / deadline
Check the current and earth cables for damages and proper installation
Interval depends on the operating conditions, at the latest, however, every
4 weeks
First inspection
Every 500 operating hours or every 6 months
Main inspection
Once a year:
○
Check rolling bearing and replace, if necessary
○
Change radial sealing ring
○
Check for outside damages
○
Check for traces of an explosion within the pressure-encapsulated motor
○
Check the function of the thermal circuit breaker
Содержание 655-41261-1
Страница 83: ...15 EN Annex 83 951 181 014 EN Version 16 Annexes purchase parts Declaration of conformity of gear make Rehfuss...
Страница 84: ...EN Annex 84 951 181 014 EN Version 16 Declaration of conformity of EDRN motor make SEW...
Страница 85: ...15 EN Annex 85 951 181 014 EN Version 16 Declaration of conformity of DFR motor make SEW...
Страница 86: ...EN Annex 86 951 181 014 EN Version 16 Declaration of conformity of BA AP80 motor make ELNOR...
Страница 88: ...EN Annex 88 951 181 014 EN Version 16 Declaration of conformity of motor make CEMP...
Страница 89: ...15 EN Annex 89 951 181 014 EN Version 16 Declaration of conformity of motor make CEMP...
Страница 90: ...EN Annex 90 951 181 014 EN Version 16 Declaration of conformity of motor make CEMP...
Страница 91: ...15 EN Annex 91 951 181 014 EN Version 16 Declaration of conformity of terminal box make Bartec...
Страница 92: ...EN Annex 92 951 181 014 EN Version 16 Declaration of conformity of capacitive sensor make Turck...