21
2
English
27/05/14 Rev:1.0.0
12 - MAINTENANCE
12.1 Programmed routine maintenance
Maintenance should be carried out according to the effective running time of the system so to ensure
ef
fi
cient performance and avoid serious mechanical damages.
BEFORE CARRYING OUT ANY MAINTENANCE
OPERATION, IT IS MANDATORY TO UNPLUG THE POWER
SUPPLY CABLE FROM THE POWER SUPPLY INLET.
PROTECTIVE MASK AND GLOVES MUST
ABSOLUTELY BE WORN
Working time (h) Maintenance
Executor
6
Dust bag replacement
User
54
Air exhaust blockage
Technical assistance
350
Motor brushes replacement
Technical assistance
Should the dust bag be damaged for any reason, it will be necessary to replace it and clean the
fi
lter
cartridge.