GTTZ10EJ Operation Manual
Figure 7-3
•
To restore any machine function, pull out all
emergency stop buttons and power disconnect
switch to ON position.
EMERGENCY OPERATING
When the operator is unable to control the
machine
:
1.
Other personnel shoud operate the machine from
the ground controls only as required by the safety
rules.
2.
Other qualified personnel on the platform may use
the platform controls. Do not continue operation if
the controls do not function properly.
3.
Use rescue equipmment to safely transfer the
personnel in the platform. Cranes, forlifts or other
devices of proper capacity may be used to stablize
the machine from motion.
When the platform or jib boom is caught
overhead
:
If the platform or jib boom becomes jammed or
snagged in overhead structures or equipment, rescue
all people in the platform before freeing the machine.
EMERGENCY CONTROL
In case emergency situation, malfunction or power loss
occurs, the emergency control procedures listed below
may be applied as appropriate.
To lower the mast
Mast emergency lowering , page 6-8
To lower the jib boom
Jib boom emergency lowering, page 6-8
To raise the mast
Figure 7-4
1.
Open the right turntable cover, and locate the
handle of hand pump.
2.
Insert the handle into the hole of hand pump as
indicated.
3.
While pressing the button on the end of mast lift
valve, pump the handle up and down, the mast
should raise.
To rotate the turntable
Figure 7-5
A
A
A
A
B
B
Содержание GTTZ10EJ
Страница 2: ......
Страница 6: ...This Page Intentionally Left Blank...
Страница 8: ...This Page Intentionally Left Blank...
Страница 12: ...Nov 2020 iv GTTZ10EJ Operation Manual This Page Intentionally Left Blank...
Страница 15: ...MACHINE SPECIFICATIONS GTTZ10EJ Operation Manual 1 3 Nov 2020 Chart of motion Figure 1 1 Chart of motion...
Страница 16: ...Nov 2020 1 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank MACHINE SPECIFICATIONS...
Страница 30: ...Nov 2020 3 12 GTTZ10EJ Operation Manual This Page Intentionally Left Blank SAFETY...
Страница 32: ...Nov 2020 4 2 GTTZ10EJ Operation Manual This Page Intentionally Left Blank JOBSITE INSPECTION...
Страница 36: ...Nov 2020 5 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank PRE OPERATION INSPECTION...
Страница 58: ...Nov 2020 8 4 GTTZ10EJ Operation Manual TRANSPORTING AND LIFTING THE MACHINE Figure 8 3...
Страница 68: ...Nov 2020 10 2 GTTZ10EJ Operation Manual DECALS NAMEPLATES INSPECTION DECALS NAMEPLATES GB...
Страница 71: ...DECALS NAMEPLATES INSPECTION GTTZ10EJ Operation Manual 10 5 Nov 2020 DECALS NAMEPLATES CE METRIC...
Страница 74: ...Nov 2020 10 8 GTTZ10EJ Operation Manual DECALS NAMEPLATES INSPECTION DECALS NAMEPLATES CE IMPERIAL...
Страница 77: ...DECALS NAMEPLATES INSPECTION GTTZ10EJ Operation Manual 10 11 Nov 2020 DECALS NAMEPLATES ANSI...
Страница 80: ...Nov 2020 10 14 GTTZ10EJ Operation Manual This Page Intentionally Left Blank DECALS NAMEPLATES INSPECTION...
Страница 84: ...Nov 2020 A 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank DECALS NAMEPLATES INSPECTION...