GTTZ10EJ Operation Manual
8-1
© Nov. 2020
8
TRANSPORTING AND LIFTING THE
MACHINE
TRANSPORT AND LIFTING HAZARD
•
Use a forklift or crane with the
proper lifting capacity to lift the
machine. Use good judgment and
a planned movement to control
the machine.
•
The transport vehicle must be
parked on level ground.
•
The transport vehicle must be
secured from rolling when loading
the machine.
•
Ensure that the vehicle capacity,
loading surface, belts or ropes are
sufficient to support the weight of
the machine,refer to
.
•
Before driving the machine onto
the transport vehicle, ensure that
the slope is within the limit of the
machine gradeability, refer to
Machine Specifications, page 1-1
•
Be sure the machine is on a level
surface or secured before
releasing the brake.
•
Never transport people on the
machine while the machine is
being towed or while the machine
is engaged in towing or lifting
operations.
•
The machine should be
transported following the local
laws and traffic rules.
•
When using a forklift or crane to
lift the machine, beware not to
collide the machine with the
nearby objects.
•
Lock the wheels of the machine
after it has been loaded to prevent
the machine from rolling.
NOTICE
Do not tow/drag the machine unless an emergency,
failure or loss of power occurs. Refer to
Содержание GTTZ10EJ
Страница 2: ......
Страница 6: ...This Page Intentionally Left Blank...
Страница 8: ...This Page Intentionally Left Blank...
Страница 12: ...Nov 2020 iv GTTZ10EJ Operation Manual This Page Intentionally Left Blank...
Страница 15: ...MACHINE SPECIFICATIONS GTTZ10EJ Operation Manual 1 3 Nov 2020 Chart of motion Figure 1 1 Chart of motion...
Страница 16: ...Nov 2020 1 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank MACHINE SPECIFICATIONS...
Страница 30: ...Nov 2020 3 12 GTTZ10EJ Operation Manual This Page Intentionally Left Blank SAFETY...
Страница 32: ...Nov 2020 4 2 GTTZ10EJ Operation Manual This Page Intentionally Left Blank JOBSITE INSPECTION...
Страница 36: ...Nov 2020 5 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank PRE OPERATION INSPECTION...
Страница 58: ...Nov 2020 8 4 GTTZ10EJ Operation Manual TRANSPORTING AND LIFTING THE MACHINE Figure 8 3...
Страница 68: ...Nov 2020 10 2 GTTZ10EJ Operation Manual DECALS NAMEPLATES INSPECTION DECALS NAMEPLATES GB...
Страница 71: ...DECALS NAMEPLATES INSPECTION GTTZ10EJ Operation Manual 10 5 Nov 2020 DECALS NAMEPLATES CE METRIC...
Страница 74: ...Nov 2020 10 8 GTTZ10EJ Operation Manual DECALS NAMEPLATES INSPECTION DECALS NAMEPLATES CE IMPERIAL...
Страница 77: ...DECALS NAMEPLATES INSPECTION GTTZ10EJ Operation Manual 10 11 Nov 2020 DECALS NAMEPLATES ANSI...
Страница 80: ...Nov 2020 10 14 GTTZ10EJ Operation Manual This Page Intentionally Left Blank DECALS NAMEPLATES INSPECTION...
Страница 84: ...Nov 2020 A 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank DECALS NAMEPLATES INSPECTION...