GTTZ10EJ Operation Manual
6-1
© Nov. 2020
6
PRE-OPERATION FUNCTION TEST
UNSAFE OPERATION HAZARD
Be sure to follow the instructions and
safety rules in this manual. Failure to
follow the instructions and safety
rules in this manual may result in
death or serious injury.
Do not operate this machine unless
you have learned and practiced the
rules for safely operating the ma-
chine as stated in this manual.
•
Know and understand the safety
rules before continuing the next
step.
•
Avoid dangerous situations.
•
Always check the machine before
operating.
•
Select appropriate machinery and
personal protective equipment
(hard hats, safety belt and gloves,
etc.) for the task.
•
Always perform a pre-operation
inspection.
•
Always perform a pre-operation
function test before using the
machine.
•
Check the work site.
•
Check the safety decals/ name-
plate on the machine.
•
Only use the machine according
to the instructions in this manual
and for its intended purpose.
Conducting a pre-operation function test helps you dis-
cover potential problems before you start using the ma-
chine. The operator must test all machine functions
according to the instructions in this manual.
Do not use a machine with problems or malfunctions.
Mark the machine and do not use it if you discover any
problems. Only qualified maintenance technicians can
repair the machine according to the manufacturer’s
regulations.
After any maintenance, the operator must perform an-
other pre-operation inspection before conducting a pre-
operation function test.
PREPARING FOR A PRE-
OPERATION FUNCTION
TEST
Before beginning a pre-operation function test:
1.
Select a test area that has a solid, flat, level
surface.
2.
Ensure the test area is free of obstacles.
3.
Connect the battery to the machine if it is not al-
ready connected.
GROUND CONTROLS
NOTICE
All function tests of ground controls must be
completed within a cycle.
Содержание GTTZ10EJ
Страница 2: ......
Страница 6: ...This Page Intentionally Left Blank...
Страница 8: ...This Page Intentionally Left Blank...
Страница 12: ...Nov 2020 iv GTTZ10EJ Operation Manual This Page Intentionally Left Blank...
Страница 15: ...MACHINE SPECIFICATIONS GTTZ10EJ Operation Manual 1 3 Nov 2020 Chart of motion Figure 1 1 Chart of motion...
Страница 16: ...Nov 2020 1 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank MACHINE SPECIFICATIONS...
Страница 30: ...Nov 2020 3 12 GTTZ10EJ Operation Manual This Page Intentionally Left Blank SAFETY...
Страница 32: ...Nov 2020 4 2 GTTZ10EJ Operation Manual This Page Intentionally Left Blank JOBSITE INSPECTION...
Страница 36: ...Nov 2020 5 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank PRE OPERATION INSPECTION...
Страница 58: ...Nov 2020 8 4 GTTZ10EJ Operation Manual TRANSPORTING AND LIFTING THE MACHINE Figure 8 3...
Страница 68: ...Nov 2020 10 2 GTTZ10EJ Operation Manual DECALS NAMEPLATES INSPECTION DECALS NAMEPLATES GB...
Страница 71: ...DECALS NAMEPLATES INSPECTION GTTZ10EJ Operation Manual 10 5 Nov 2020 DECALS NAMEPLATES CE METRIC...
Страница 74: ...Nov 2020 10 8 GTTZ10EJ Operation Manual DECALS NAMEPLATES INSPECTION DECALS NAMEPLATES CE IMPERIAL...
Страница 77: ...DECALS NAMEPLATES INSPECTION GTTZ10EJ Operation Manual 10 11 Nov 2020 DECALS NAMEPLATES ANSI...
Страница 80: ...Nov 2020 10 14 GTTZ10EJ Operation Manual This Page Intentionally Left Blank DECALS NAMEPLATES INSPECTION...
Страница 84: ...Nov 2020 A 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank DECALS NAMEPLATES INSPECTION...