GTTZ10EJ Operation Manual
iii
© Nov. 2020
INTRODUCTION
Thank you for choosing and using the machinery of
Hunan Sinoboom Intelligent Equipment Co., Ltd. Al-
ways read, understand and become familiar with the
operation requirements of the machine and its associ-
ated safety procedures before operating, maintaining
and repairing the machine. Operating the machine with-
out becoming familiar with its specific operation require-
ments and safety procedures poses serious risks.
Operators who follow safety rules and operate the ma-
chine carefully and effectively will prevent personal in-
jury, property loss and accidents.
Use this machine only to transport tools to work loca-
tions and for performing tasks on the work platform. Op-
erators must be competent and must obtain training to
carefully use the machine and follow safety procedures.
Only trained and authorized personnel may operate the
machine.
This manual guides the operator in operating and using
the machine. The operator is responsible for reading,
understanding and implementing the operation and
safety procedures in this manual and for following the
manufacturer’s instructions before beginning any work.
Read, understand and follow all safety rules and oper-
ating instructions. The operator must also consider the
machine’s uses and limitations and the conditions at
the jobsite before using this machine. Strictly following
all safety requirements in this manual is critical.
Consider this manual a part of the machine, along with
Maintenance Manual
and
Parts Manual
, and always
keep the manuals with the machine. The owner or ad-
ministrator of the machine shall offer all manuals and
other necessary information provided by the machine
manufacturer regarding the daily inspection and main-
tenance to each of the renters. If the machine is sold,
the owner or administrator must pass along the man-
uals and other necessary information to the purchaser.
The owner or administrator of the machine shall also
provide the manufacturer’s maintenance information to
the person responsible for maintaining the machine.
If you have any questions, contact Hunan Sinoboom In-
telligent Equipment Co., Ltd..
Содержание GTTZ10EJ
Страница 2: ......
Страница 6: ...This Page Intentionally Left Blank...
Страница 8: ...This Page Intentionally Left Blank...
Страница 12: ...Nov 2020 iv GTTZ10EJ Operation Manual This Page Intentionally Left Blank...
Страница 15: ...MACHINE SPECIFICATIONS GTTZ10EJ Operation Manual 1 3 Nov 2020 Chart of motion Figure 1 1 Chart of motion...
Страница 16: ...Nov 2020 1 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank MACHINE SPECIFICATIONS...
Страница 30: ...Nov 2020 3 12 GTTZ10EJ Operation Manual This Page Intentionally Left Blank SAFETY...
Страница 32: ...Nov 2020 4 2 GTTZ10EJ Operation Manual This Page Intentionally Left Blank JOBSITE INSPECTION...
Страница 36: ...Nov 2020 5 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank PRE OPERATION INSPECTION...
Страница 58: ...Nov 2020 8 4 GTTZ10EJ Operation Manual TRANSPORTING AND LIFTING THE MACHINE Figure 8 3...
Страница 68: ...Nov 2020 10 2 GTTZ10EJ Operation Manual DECALS NAMEPLATES INSPECTION DECALS NAMEPLATES GB...
Страница 71: ...DECALS NAMEPLATES INSPECTION GTTZ10EJ Operation Manual 10 5 Nov 2020 DECALS NAMEPLATES CE METRIC...
Страница 74: ...Nov 2020 10 8 GTTZ10EJ Operation Manual DECALS NAMEPLATES INSPECTION DECALS NAMEPLATES CE IMPERIAL...
Страница 77: ...DECALS NAMEPLATES INSPECTION GTTZ10EJ Operation Manual 10 11 Nov 2020 DECALS NAMEPLATES ANSI...
Страница 80: ...Nov 2020 10 14 GTTZ10EJ Operation Manual This Page Intentionally Left Blank DECALS NAMEPLATES INSPECTION...
Страница 84: ...Nov 2020 A 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank DECALS NAMEPLATES INSPECTION...