© Nov. 2020
6-8
GTTZ10EJ Operation Manual
TESTING THE DRIVE SPEED
1.
Draw two lines on the ground as reference, with the
spacing of the two lines being 30m (98ft 5in)
2.
Start the machine in stowed position.
3.
Push the drive function button, then press and hold
the enable button on the joystick and slowly deflect
forward the joystick to the full stroke.
4.
When the max drive speed is achieved and the front
wheels reach the first line, start the time counting.
5.
When the front wheels reach the second line, stop
the time counting, and slowly bring the machine to a
stop.
6.
The time counted should be 27s.
7.
If the time counted is less than 27s, immediately
stop the testing and tag the machine, otherwise, go
on to the next step.
8.
Raise the mast approx. 1m (3ft 3in).
9.
Push the drive function button, then press and hold
the enable button on the joystick and slowly deflect
forward the joystick to the full stroke.
10.
When the max drive speed is achieved and the front
wheels reach the first line, start the time counting.
11.
When the front wheels reach the second line, stop
the time counting, and slowly bring the machine to a
stop.
12.
The time counted should be 180s.
13.
If the time counted is less than 180s, immediately
stop the testing and tag the machine.
TESTING THE EMERGENCY
LOWERING
COLLISION HAZARD
Be sure no person is under the jib
boom before lowering the mast and
jib boom.
MAST EMERGENCY LOWERING
1.
Start the machine from the ground controls.
2.
Push the mast up/down function button.
3.
Simultaneously press and hold the enable button
and the up/rotate left control button to raise the
mast to full height.
4.
Pull out the handle of the mast lift control valve.
Figure 6-4
5.
The mast should lower in place.
JIB BOOM EMERGENCY LOWERING
1.
Start the machine from the ground controls.
2.
Push the jib boom up/down function button.
3.
Simultaneously press and hold the enable button
and the up/rotate left control button to raise the jib
boom to full height.
4.
Using a suitable screwdriver, insert it into the jib
boom lift control valve as indicated in the figure
below.
Содержание GTTZ10EJ
Страница 2: ......
Страница 6: ...This Page Intentionally Left Blank...
Страница 8: ...This Page Intentionally Left Blank...
Страница 12: ...Nov 2020 iv GTTZ10EJ Operation Manual This Page Intentionally Left Blank...
Страница 15: ...MACHINE SPECIFICATIONS GTTZ10EJ Operation Manual 1 3 Nov 2020 Chart of motion Figure 1 1 Chart of motion...
Страница 16: ...Nov 2020 1 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank MACHINE SPECIFICATIONS...
Страница 30: ...Nov 2020 3 12 GTTZ10EJ Operation Manual This Page Intentionally Left Blank SAFETY...
Страница 32: ...Nov 2020 4 2 GTTZ10EJ Operation Manual This Page Intentionally Left Blank JOBSITE INSPECTION...
Страница 36: ...Nov 2020 5 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank PRE OPERATION INSPECTION...
Страница 58: ...Nov 2020 8 4 GTTZ10EJ Operation Manual TRANSPORTING AND LIFTING THE MACHINE Figure 8 3...
Страница 68: ...Nov 2020 10 2 GTTZ10EJ Operation Manual DECALS NAMEPLATES INSPECTION DECALS NAMEPLATES GB...
Страница 71: ...DECALS NAMEPLATES INSPECTION GTTZ10EJ Operation Manual 10 5 Nov 2020 DECALS NAMEPLATES CE METRIC...
Страница 74: ...Nov 2020 10 8 GTTZ10EJ Operation Manual DECALS NAMEPLATES INSPECTION DECALS NAMEPLATES CE IMPERIAL...
Страница 77: ...DECALS NAMEPLATES INSPECTION GTTZ10EJ Operation Manual 10 11 Nov 2020 DECALS NAMEPLATES ANSI...
Страница 80: ...Nov 2020 10 14 GTTZ10EJ Operation Manual This Page Intentionally Left Blank DECALS NAMEPLATES INSPECTION...
Страница 84: ...Nov 2020 A 4 GTTZ10EJ Operation Manual This Page Intentionally Left Blank DECALS NAMEPLATES INSPECTION...