Page 37
2) Locate the input voltage selection terminal block and the voltage selection wire
shown in the picture below.
3) Connect the voltage selection wire to the terminal that matches your facility supply
voltage according to the input voltage selection terminal wiring instruction.
4) Locate the power cord connection terminal and connect the two power lines and
the earth line of the power cord as shown below.
Make especially sure that the
earth line is properly connected for safe and proper operation.
5)
Verify all connections & connect power cord to the facility input voltage source.
Primary Earth Point.
(Green Wire)
R0
T0
Positive (Brown)
Negative (Blue)
Содержание Cycraft
Страница 16: ...Page 16 3 NAMES OF MAJOR PARTS 18 11 12 13 14 15 16 17 28 ...
Страница 30: ...Page 30 Hexa bolt M8 x 30L DU Bush 10 15 Rubber Washer 11 20 3t Spring Washer Flat Washer ...
Страница 73: ...Page 73 10 2 Cabin Schematic SCHEMATIC 2 HERE ...
Страница 74: ...Page 74 10 3 MCU Schematic DOCUMENT END SCHEMATIC 3 HERE ...