10
3.3
HANGING THE BOILER
– Remove the outer casing as follows with reference to
fig. 8:
– remove the front panel fixing screw (6);
– remove the front panel (5) by pulling forwards, star-
ting at the top corners;
– unscrew the fixing screws (1) securing each side panel
(3) and (4) (two each), and remove the panels by sli-
ding upwards to release the supporting hooks.
– Lift the appliance into position. The upper cross member
locates onto the wall mounting bracket. Slide the
appliance sideways (if necessary) until the lower frame
fixing holes line up with the wall plugs.
– Screw in the wall mounting bracket adjusting screws
until the appliance is secure and vertical, then pivot the
control box downwards by removing the two rear
screws as shown in fig. 14 and fit the two lower fixing
screws to prevent any further movement using a long
screwdriver through the clearance holes provided. Pivot
the control box back into position and resecure with the
two screws.
3.4
FLUE AND TERMINAL PREPARATION
If the wall thickness is less than 0.5 m (19 in) the flue/air
duct may be fitted without access to the outside wall provi-
ding that the optional wall liner kit is used. (This consists of
a steel pipe, 0.5 m long and 129 mm outside diameter with
a 1 mm wall thickness.)
3.4.1 Flue/air duct lenghts
– Determine whether an extension duct is required with
reference to the
Z
dimension shown in figs. 10 - 11 -
13. Alternatively wall thickness information is given in
tables 5a - 5b.
Z
Dimension UP TO 945 mm.
No extension duct required.
Z
Dimension greater than 945 mm and up to 1,760 mm.
One extension duct kit required.
Z
Dimension greater than 1,760 mm and up to 2,575
mm. Two extension duct kits required.
Z
Dimension greater than 2,575 mm.
NOT PERMITTED.
– If no extension ducts are required, procede to 3.4.2.
– If an extension duct or ducts is/are to be used, the flue
and air ducts should be joined before proceeding to the
next section. The extension ducts should be joined to
each other and to the standard ducts using the fol-
lowing procedure (fig. 9):
Fig. 9
Fig. 8
KEY
1
Side panel screws
2
Rear frame
3
L.H. side panel
4
R.H. side panel
5
Front panel
6
Front panel fixing screws
7
Fixing screws steel plates
Содержание SUPER 102
Страница 1: ...Super Combination Boilers installation and servicing instructions...
Страница 2: ......
Страница 25: ...21 7 INTERNAL WIRING DIAGRAMS AND VIEWS 7 1 FUNCTIONAL FLOW WIRING DIAGRAM Fig 23 a...
Страница 26: ...22 7 2 ILLUSTRATED WIRING DIAGRAM Fig 23 b...
Страница 35: ......