6 INSTALLATION
m
CAUTION
The appliance must only be installed by the
Sime Ltd
Technical Service or by qualified professionals
who
MUST wear
suitable protective safety equipment.
6.1
Receiving the product
Murelle Pro HE MkII
appliances are delivered in a single unit
protected by cardboard packaging.
Fig. 14
The plastic bag found inside the packaging contains the follow-
ing:
– Installation, use and maintenance manual
– Paper template for boiler installation
– Bracket for mounting the boiler on the wall
– Certificate of warranty
– Hydrostatic test certificate
– Hanging Bracket
– Connection pack
d
DO NOT
Do not leave packaging material around or near chil-
dren since it could be dangerous. Dispose of it as pre-
scribed by legislation in force.
6.2
Dimensions and weight
H
W
D
Fig. 15
Description
Murelle Pro HE MkII
30
35
W (mm)
400
D (mm)
250
250
H (mm)
700
Weight (kg)
28,5
30,0
6.3
Handling
Once the packaging has been removed, the appliance is to be
handled manually, tilting it slightly, lifting it and applying pres-
sure in the points indicated in the figure.
Fig. 16
d
DO NOT
To grip the appliance casing. Hold the "solid" parts of
the appliance such as the base and structural frame.
a
WARNING
Use suitable tools and personal protection when re-
moving the packaging and when handling the appli-
ance. Observe the maximum weight that can be lifted
per person.
6.4
Ventilation requirements
Detailed recommendations for the air supply are given in BS
5440-2. The following note is given for guidance. It is not nec-
essary to have purpose provided air vents in the room or com-
partment that the appliance is installed.
The minimum temperature of the installation room must NOT
be lower than
-5 °C
.
m
CAUTION
– Before assembling the appliance, the installer
MUST
make sure that the wall supports the weight.
– Observe the required clearances (see Fig. 17).