11  APPENDIX 2

52

9

APPENDIX 2

FLOWCHART FOR CO AND COMBUSTION RATIO CHECK ON COMMISSIONING A CONDENSING BOILER

PRIOR TO CO AND COMBUSTION RATIO CHECK

The installation instructions should have been followed, gas type verified and gas supply pressure/rate checked as required prior to commissioning. 

As part of the installation process, 

ESPECIALLY WHERE A FLUE HAS BEEN FITTED BY PERSONS OTHER THAN THE BOILER INSTALLER

, visually check the integri-

ty of the whole flue system to confirm that all components are correctly asembled, fixed and supported. Check that manufacturer's maximum flue lengths have not

been exceeded and all guidance has been followed (e.g. Gas Safe Technical Bulletin TB008).

The flue gas analyser should be of the correct type, as specified by BS 7967

Prior to its use, the flue gas analyser should have been maintained and calibrated as specified by the manufacturer. The installer must have the relevant competence

for use of the analyser.

Check and zero the analyser IN FRESH AIR as per analyser manufacturer's instructions.

NOTE  

the air gas ratio valve is factory-set and must not be adjusted DURING

COMMISSIONING unless this action is recommended after discussions

with SIME LTD.

If any such adjustment is recommended and further checking of the boiler

is required the installer/service engineer must be competent to carry out

this work and to use the flue gas analyser accordingly.

If the boiler requires conversion to operate  with a different gas family

(e.g. conversion from natural gas to LPG) separate guidance will be provi-

ded by the boiler manufacturer and must be followed.

SET BOILER TO MAXIMUM RATE

Set the boiler to operate at maximum rate (full load condi-

tion). Allow sufficient time for combustion to stablilise. 

NOTE - Do not insert analyser probe during this period

to avoid possible "flooding" of sensor.

CARRY OUT FLUE INTEGRITY CHECK USING ANALYSER

Insert analyser probe into the air inlet test point and allow readings

to stabilise. 

NOTE - The flue must always be installed with flue test point.

This will be located within the first piece connected to the boiler.

Is O

2

less than 

or equal to 20.6% 

and 

CO

2

less than 0.2%

VERIFY FLUE INTEGRITY  

Analyser readings indicate that combustion products and inlet air must be

mixing. Further investigation of the flue is therefore required.

Check that flue components are assembled, fixed and supported as per boi-

ler/flue manufacturer's instructions.

Check that flue and flue terminal are not obstructed. 

Is O

2

less than 

or equal to 20.6% 

and 

CO

2

less than 0.2%

CHECK CO AND COMBUSTION RATIO  AT MAXIMUM RATE

With boiler still set at maximum rate, insert analyser probe into

flue gas samplng point. Allow readings to stablise before recording.

Turn off appliance and call SIME

LTD Technical HelplIne for advice.

the appliance must not be com-

missioned or used, until problems

are identified and resolved.

Is CO less than 350ppm 

AND 

CO/CO

2

ratio less than 0.004 

Check all seals around the appliance

burner, internal flue seals, door and

case seals. Rectify where necessary.

SET BOILER TO MINIMUM RATE

In accordance with boiler instructions, set boiler to operate at

minimum rate (to minimum load condition). Allow sufficient time for

combustion to stablilise. 

NOTE: If manufacturer's instructions do not specify how to set

boiler to minimum rate contact Technical Helpline for advice.

CHECK CO AND COMBUSTION RATIO AT MINIMUM RATE

With boiler set at minimum rate, insert analyser probe into flue gas

samplng point. Allow readings to stablise before recording.

NOTE - if no flue gas sampling point is present and the correct pro-

cedure is not specified in the manual, contact SIME LTD Technical

Helpline for advice.

Is CO less than

350ppm 

AND

CO/CO

2

ratio 

less than 0.004

Turn off appliance and call SIME LTD

Technical HelplIne for advice.

the appliance must not be commissio-

ned or used until problems are identi-

fied and resolved.

NOTE

Check and record CO and combustion

ratio at both maximum AND minimum

rate before contacting  SIME LTD.

Is CO less than 350ppm 

AND 

CO/CO

2

ratio 

less than 0.004 

BOILER IS OPERATING SATISFACTORILY 

no further actions required

Ensure test points are capped, boiler case is correctly repleced and all other commissioning pro-

cedures are completed.

Complete Benchmark Checklist, recording CO and combustion ratio readings as required.

NO

YES

YES

NO

NO

YES

YES

NO

NO

YES

Содержание MURELLE PRO HE MkII

Страница 1: ...BENCHMARK SECTION PLEASE READ THE IMPORTANT NOTICE WITHIN THIS GUIDE REGARDING YOUR BOILER WARRANTY Cod 6316191 08 2013 BRAVA DGT HE 25 30 35 199838 INSTALLATION AND SERVICING INSTRUCTIONS ENSURE THAT...

Страница 2: ...into its installation location Manoeuvring the boiler may include the use of a sack truck and involve lifting pushing and pulling Caution should be exercised during these operations Operatives should...

Страница 3: ...3...

Страница 4: ...ssioning instructions for filling in the checklist at the back of this installation guide Note All Gas Safe registered installers carry a ID Card You can check your installer is Gas Safe Registered by...

Страница 5: ...wing opera tions must be carried out set the main isolation switch to OFF close the gas and water valves for the water heating system To ensure continued efficient opera tion of the appliance it is re...

Страница 6: ...the main switch to OFF and closing the gas supply Do not modify the safety or adjustment devices without authorization and in structions from the manufacturer d DO NOT Do not block the condensate dra...

Страница 7: ...late for the serial number and year of manufacture SYMBOLS a WARNING To indicate actions which if not carried out correctly can result in injury of a general nature or may dam age or cause the applian...

Страница 8: ...8...

Страница 9: ...CALLING ON 0800 408 5500 OR ALTERNATIVELY WWW GASSAFEREGISTER CO UK 1 OPERATING THE MURELLE PRO HE MkII 10 1 1 Control panel 10 1 2 Preliminary checks 11 1 3 Ignition 11 1 4 Adjusting the delivery te...

Страница 10: ...bol appears when the boiler is operating in Summer mode or if only the domestic hot water mode is enabled via the remote control If the symbols land nare flashing this indicates that the chimney sweep...

Страница 11: ...tion After having carried out the preliminary checks proceed as fol lows set the main system switch to ON on the display check that the operating mode on the display is SUMMER l and if necessary selec...

Страница 12: ...fied technical professional 1 6 1 Maintenance request When it is time to perform maintenance on the boiler SE shows on the display Contact the technical assistance service to organise the nec essary w...

Страница 13: ...lly qualified personnel who will follow the indications provided in the INSTALLATION AND MAINTENANCE MANUAL 3 2 External cleaning a WARNING Should it be necessary to access the areas in the bottom par...

Страница 14: ...14...

Страница 15: ...5 1 Characteristics 16 5 2 Check and safety devices 16 5 3 Identification 16 5 3 1 Technical Data Plate 17 5 4 Structure 18 5 5 Technical features 19 5 6 Main water circuit 20 5 7 Sensors 20 5 8 Expan...

Страница 16: ...agnostic param eters with error code display when the fault occurs This makes repair interventions easier and allows appliance op eration to be restored correctly combustion control function this func...

Страница 17: ...AME MAX USEFUL OUTPUT 50 30 C MAX OPERATING PRESSURE MAX USEFUL OUTPUT 80 60 C MAX HEAT INPUT WATER CONTENT IN BOILER FLOW RATE MAX OPERATING PRESSURE ELECTRICAL SUPPLY MAXIMUM ABSORBED POWER MAX HEAT...

Страница 18: ...y thermostat TS 8 Delivery sensor SM 9 Fan 10 Condensate siphon 11 Diverter valve 12 Domestic hot water sensor SS 13 Control panel 14 Domestic hot water heat exchanger 15 Gas valve 16 Domestic hot wat...

Страница 19: ...rate l min 2 2 Max PMW Min pressure bar 6 0 5 7 0 5 kPa 600 50 700 50 ENERGY PERFORMANCE HEATING Heating seasonal energy efficiency class A A Heating seasonal energy efficiency 93 93 Sound power dB A...

Страница 20: ...ock 5 7 Sensors The sensors installed have the following characteristics Dual sensor thermal safety output NTC R25 C 10k domestic hot water sensor NTC R25 C 10k external sensor NTC R25 C 10k Correspon...

Страница 21: ...ers or decrease the values This allows the engineer to scroll through the parame ters or increase the values o This allows the engineer to confirm the selected param eter or to modify the value or to...

Страница 22: ...ol instead of room thermostat OP Mechanical timer Note Volt free external controls TA are connected to terminals 5 and 6 after removal of the link Fig 13 m CAUTION Installer must Connect the boiler to...

Страница 23: ...23...

Страница 24: ...tions by competent persons and that it meets the require ments of the appropriate Building Regulations The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and shoul...

Страница 25: ...let collection 28 6 11 Gas supply 28 6 12 Connecting the flue 29 6 12 1 Flue Terminal Positions 29 6 12 2 Installation of coaxial flues 60 100mm 80 125mm 30 6 12 3 Installation of separate ducts 80mm...

Страница 26: ...35 W mm 400 D mm 250 250 H mm 700 Weight kg 28 5 30 0 6 3 Handling Once the packaging has been removed the appliance is to be handled manually tilting it slightly lifting it and applying pres sure in...

Страница 27: ...to pump and valves boiler noise and circulation problems Before connecting the boiler the associated central heating system must be flushed in accordance with the guidelines given in BS 7593 Treatmen...

Страница 28: ...t have a continuous fall from the boiler and must be resistant to corrosion by condensate copper or steel is NOT suitable It should be noted that the connection of a condensate pipe to a drain may be...

Страница 29: ...uisance should be avoided 75 mm 200 mm 75 mm 300 mm 1 200 mm 600 mm 300 mm 600 mm 1 200 mm 300 mm 3 in 8 in 3 in 12 in 48 in 24 in 300 mm 12 in 12 in 24 in 48 in 300 mm 12 in 1 500 mm 300 mm 300 mm 60...

Страница 30: ...e 8095970 reduces the available length by 1 0 metres HORIZONTAL FLUES MUST BE LEVEL NOTE Before connecting accessories it is always advisable to lubricate the internal part of the gaskets with silicon...

Страница 31: ...90 bend code 8077450 0 25 3 a Extension 80mm L 1000 code 8077351 3 b Extension 80mm L 500 code 8077350 7 45 bend code 8077451 0 20 9 Inlet exhaust fitting code 8091401 10 Articulated tile code 8091300...

Страница 32: ...is boiler The installation of this boiler must be in accordance with the relevant requirements of the current Gas Safety installation and use Regulation 1998 the local building regula tions and I E E...

Страница 33: ...d on the packaging of the product itself Climatic curve Delivery temperature 20 15 10 5 0 10 15 5 20 80 90 70 60 50 40 30 20 C C K 9 K 7 K 8 K 5 K 6 K 3 K 4 K 2 K 1 External temperature Fig 29 m CAUTI...

Страница 34: ...rds and release it from the top by lifting it 1 2 Fig 34 Domestic hot water circuit open the domestic hot water inlet isolation valve 4 open each of the DHW taps until air is expelled Heating circuit...

Страница 35: ...t the top push ing it forwards and securing it with the screw 1 which was removed previously 6 14 3 EMPTYING operations Domestic hot water circuit close the domestic hot water circuit isolation valve...

Страница 36: ...r press and hold down the buttons o and at the same time for approximately 12 seconds until the flashing symbols l and n appear on the display as soon as the symbols begin to flash release the buttons...

Страница 37: ...CONFIGURATION tS 0 1 Index showing boiler power in kW 2 30 kW 3 35 kW 1 2 o 3 tS 0 2 Hydraulic configuration 0 combi 1 N A 2 N A 3 N A 4 N A 5 N A 6 N A 1 0 tS 0 3 Gas Type Configuration 0 G20 1 G31...

Страница 38: ...isconnect the appliance from the mains power by setting the main switch to OFF as a precautionary measure close the gas isolation valve NOTE after having repaired the fault when the alarm number appea...

Страница 39: ...ervice 1 199 months 1 CO 0 7 total no of calibrations 1 199 x 1 1 TABLE OF ACTIVATED ALARMS FAULTS Type No Description AL 00 Last activated alarm fault AL 01 Last but one activated alarm fault AL 02 T...

Страница 40: ...ck is connected directly to the gas valve 7 7 Gas conversion Murelle Pro HE MkII models can work with G20 or G31 without the need for any mechanical conversion Simply select parame ter 0 3 see Paramet...

Страница 41: ...at the system components and pipes are not hot risk of burning a WARNING Before carrying out any interventions described isolate the power supply isolate the gas cock avoid contact with any hot surfac...

Страница 42: ...w and return valves and drain the boiler Check the expansion vessel pressure is not less than 1 bar If this is not the case pressurize it to the correct value see sectionExpan sion vessel page 20 8 4...

Страница 43: ...t your network provider AL 40 Incorrect supply fre quency detected Contact your network provider Type No Fault Solution AL 41 Flame loss more than 6 consecutive times Check the ignition detec tion ele...

Страница 44: ...pressure Check expansion vessel Limited production of domestic hot water Check the diverter valve Check that plate heat exchanger is clean Check domestic hot water circuit valve 8 6 1 Maintenance requ...

Страница 45: ...rate m hr OR ft hr r a b m e t a r m u m i x a m t a e r u s s e r p g n i t a r e p o r e n r u B OR r a b m e t a r m u m i x a m t a e r u s s e r p t e l n i s a G Cold water inlet temperature C...

Страница 46: ...Record At max rate CO ppm AND CO At min rate Where Possible CO ppm AND CO Comments Signature SERVICE 04 Date Engineer name Company name Telephone No Gas safe register No Record At max rate CO ppm AND...

Страница 47: ...47 9 EXPLODED VIEWS...

Страница 48: ...48...

Страница 49: ...49...

Страница 50: ...50...

Страница 51: ...ring X X 54 6227462 Flowing pipe to C H system X X Pos Code Description Murelle Pro HE 30 35 55 6226412 O ring 3068 X X 56 6231372 Temperature sensor X X 57 6146729 100 C safety stat X X 58 6226601 Sp...

Страница 52: ...ork must be a minimum of 19mm ID typically 22mm OD plastic pipe or as per manufacturer s instructions and this should fall a minimum of 45mm per metre away from the boiler taking the shortest practica...

Страница 53: ...ir break is required Key 1 Boiler 2 Visible air break 3 75 mm trap 4 Visible air break and trap not required if there is a trap with a minimum condensate seal of 75 mm incorporated into the boiler 5 S...

Страница 54: ...nimum condensate seal of 75 mm incorporated into the boiler In this case the 100 mm is measured to the trap in the boiler 5 Sink basin bath or shower 6 Open end of condensate discharge pipe direct int...

Страница 55: ...er level end cut at 45 Note the maximum external condensate discharge length is 3 metres 6 Minimum internal diameter 19 mm 7 Pipe size transition 8 Minimum internal diameter 30 mm 9 Water weather proo...

Страница 56: ...used External waste pipes from kitchens utility rooms or bathrooms such as sink basin and bath or shower waste outlets should be insulated with waterproof UV resistant class 0 material terminated bel...

Страница 57: ...4 5 75mm sink waste trap 2 5 4 3 Key 1 Boiler 2 Visible air break at plug hole 3 75 mm sink basin bath or shower waste trap 4 Sink basin bath or shower with 5 Open end of condensate discharge pipe di...

Страница 58: ...ons should be followed The condensate pipe should be run internally as far as possible before going externally and the pipe diameter should be increased to a minimum of 30mm ID typically 32mm OD befor...

Страница 59: ...of 75mm incorporated into the boiler 5 Soil and vent stack 6 Invert 7 450mm minimum upto three storeys 8 Minimum internal diameter 19 mm 9 Pipe size transition point 10 Minimum internal diameter 30mm...

Страница 60: ...ub zero temperatures i e 15 C for 48 hours BS6798 refers to devices that gas BS6798 section 6 3 8 note 4 The boiler manufacturer s instructions will disposal of the condensate Additional Measures meas...

Страница 61: ...wed Insulation Materials Insulation used for external condensate pipes sink or washing machine waste pipes should be of class O grade with an outer coating that is weather proof is recommended for 32m...

Страница 62: ...ate discharge pipe from boiler 2 Pipe size transition point 3 Water weather proof insulation 4 43mm 90 male female bend 5 External rain water pipe into foul water 6 External air break 7 Air gap 8 9 Mi...

Страница 63: ...14 or boiler installation manual for soakaway design requirements any above ground section of condensate discharge pipe should be run and insulated as described above Figure 7 following page shows a s...

Страница 64: ...incorporated into the boiler refer to manufacturers instructions 5 External length of pipe 3 m maximum 6 Open end of condensate discharge pipe direct into gully 25 mm min below grating but above water...

Страница 65: ...be run either above or below round level End cut at 45 3 Diameter 100 mm minimum plastic tube 4 Bottom of tube sealed 5 Limestone chippings 6 Two rows of three 12 mm holes at 25 mm centres 50 mm from...

Страница 66: ...onnected to the boiler Is O2 less than or equal to 20 6 and CO2 less than 0 2 VERIFY FLUE INTEGRITY Analyser readings indicate that combustion products and inlet air must be mixing Further investigati...

Страница 67: ...n GJ C H seasonal energy efficiency D HW energy efficiency Sound power dB A Specific precautionary measures to be adopted at the time of assembly installation or maintenance of the equipment are conta...

Страница 68: ...perature regime b P1 7 1 kW At 30 of nominal heat output and low temperature regime 1 97 7 Auxiliary electricity consumption Other items At full load elmax 0 044 kW Standby heat loss Pstby 0 088 kW At...

Страница 69: ...e regime b P1 8 9 kW At 30 of nominal heat output and low temperature regime 1 97 7 Auxiliary electricity consumption Other items At full load elmax 0 047 kW Standby heat loss Pstby 0 088 kW At part l...

Страница 70: ...70...

Страница 71: ...71...

Страница 72: ...Sime Ltd 1a Blue Ridge Park Thunderhead Ridge Glasshoughton Castleford WF10 4UA Phone 0345 901 1114 Fax 0345 901 1115 www sime co uk Email enquiries sime co uk...

Отзывы: