76
The.boiler.must.be.installed.in.a.fixed.loca-
tion. and. only. by. specialized. and. qualified.
firms. in. compliance. with. all. instructions.
contained. in. this. manual.. Furthermore,.
the.installation.must.be.in.accordance.with.
current.standards.and.regulations.
.
2.1
INSTALLATION
–..Boilers. can. be. installed. in. all. domestic.
environments. without. any. whatsoever.
limit.in.terms.of.location.and.comburent.
air.supply.
–..These. boilers. can. also. be. installed. in.
partially.covered.areas,.as.per.EN.15502,.
with. a. maximum. ambient. temperature.
of.60°C.and.a.minimum.ambient.tempe-
rature. of. -5°C.. It. is. generally. advisable.
to. install. the. boilers. below. weathered.
roofs,. on. the. balcony. or. in. a. protected.
niche,.to.protect.them.from.exposure.to.
weathering.agents.(rain,.hail.and.snow)..
All.boilers.provide.a.standard.antifreeze.
function..
2.1.1
Anti-freeze function
The. boilers. are. equipped. with. anti-freeze.
function. which. activates. the. pumps. and.
the. burner. when. the. temperature. of. the.
water.contained.inside.the.appliance.drops.
to. below. 6°C.. The. anti-freeze. function. is.
ensured,.however,.only.if:
-. the.boiler..is.correctly.connected.to.the.
gas.and.electricity.supply.circuits;
-. the.boiler.is.constantly.fed;
-. the.boiler.ignition.is.not.blocked;
-. the. essential. components. of. the. boiler.
are.all.in.working.order.
In. these. conditions. the. boiler. is. protected.
against. frost. down. to. an. environmental.
temperature.of.-5°C.
ATTENTION: In the case of installation
in a place where the temperature drops
below 0°C, the connection pipes must be
protected.
2.2
BOILER SUPPORT BRACKET
For.the.mounting.of.the.support.bracket.of.
the. boiler,. which. is. supplied,. observe. the.
following.instructions.(fig..4):
–. Fix. the. bracket. to. the. wall. with. appro-
priate.dowels.
–. Check. with. a. spirit. level. that. it. is. per-
fectly.in.horizontal.plane.
–..To.fix.the.boiler.with.the.lives.put.in.evi-
dence.in.figure.
2.2.1
Complementary accessories
To.simplify.connections.to.the.hydraulic.and.
gas.supplies,.it.is.also.possible.to.use.the.
following.accessories:
–. Mounting.plate,.code.8081217
–. Kit..with.bends,.code.8075423
–. Kit.with.faucets,.code.8091833
–. Antifreeze. heaters. kit. -15°C,. code.
8089805
–. Mixed.area.kit.ZONA.MIX,.code.8092234.
For. detailed. information. on. the. assembly.
of. fittings,. see. the. instructions. contained.
in.the.box.
2.2.2 Flow regulator (fig. 5)
In. entrance. of. the. D.H.W.. a. regolator. of.
color. capacity. is. installed. brown. for. the.
vers.. “25/55 ErP”. and. blue. for. the. vers..
“30/55 ErP”;.the.regolator.is.inserted.in.a.
bag.to.equipment.of.the.boiler.
2.3
CONNECTING UP SYSTEM
To.protect.the.heat.system.from.damaging.
corrosion,. incrustation. or. deposits,. before.
installation. it. is. extremely. important. to.
clean. the. system. using. suitable. products.
such. as,. for. example,. Sentinel X300 (new
systems), X400 and X800 (old systems) or
Fernox Cleaner F3..Complete.instructions.
are.provided.with.the.products.but,.for.fur-
ther. information,. you. may. directly. contact.
SENTINEL. PERFORMANCE. SOLUTIONS.
LTD.or.FERNOX.COOKSON.ELECTRONICS.
For. long-term. protection. agains. corrosion.
and.deposits,.the.use.of.inhibitors.such.as.
Sentinel X100 or Fernox Protector F1. is.
recommended. after. cleaning. the. system..
It. is. important. to. check. the. concentration.
of.the.inhibitor.after.each.system.modifica-
tion.and.during.maintenance.following.the.
manufacturer’s. instructions. (specific. tests.
are.available.at.your.dealer)..
The.safety.valve.drain.must.be.connected.to.
a.collection.funnel.to.collect.any.discharge.
during.interventions..If.the.heating.system.
is.on.a.higher.floor.than.the.boiler,.install.
the. on/off. taps. supplied. in. kit. optional. on.
the.heating.system.delivery/return.pipes..
WARNING: Failure to clean the heat
system or add an adequate inhibitor inva-
lidates the device’s warranty.
Gas. connections. must. be. made. in. accor-
dance. with. current. standards. and. regula-
tions.. When. dimensioning. gas. pipes. from.
the. meter. to. the. module,. both. capacity.
volume. (consumption). in. m
3
/h. and. gas.
density.must.be.taken.into.account..
The. sections. of. the. piping. making. up. the.
system. must. be. such. as. to. guarantee.
a. supply. of. gas. sufficient. to. cover. the.
maximum. demand,. limiting. pressure. loss.
between.the.gas.meter.and.any.apparatus.
being.used.to.not.greater.than:
–. 1.0.mbar.for.family.II.gases.(natural.gas);
–. 2.0. mbar. for. family. III. gases. (butane. or.
propane).
An.adhesive.data.plate.is.sticked.inside.the.
front.panel;.it.contains.all.the.technical.data.
identifying.the.boiler.and.the.type.of.gas.for.
which.the.boiler.is.arranged.
2.3.1 Connection of condensation
water trap
The.drip.board.and.its.water.trap.must.be.
connected. to. a. civil. drain. through. a. pipe.
with. a. slope. of. at. least. 5. mm. per. metre.
to.ensure.drainage.of.condensation.water..
The plastic pipes normally used for civil
drains are the only type of pipe which is
appropriate for conveying condensation to
the building’s sewer pipes.
2.3.2 Filter on the gas pipe
The.gas.valve.is.supplied.ex.factory.with.an.
inlet.filter,.which,.however,.is.not.adequate.
to.entrap.all.the.impurities.in.the.gas.or.in.
2
INSTALLATION
Fig..4
Fig..5
Содержание MURELLE HE 25-30 ErP
Страница 2: ......
Страница 109: ...109 ES PT ENG NOTES...
Страница 110: ...110 NOTES...
Страница 111: ......