FLOWCHART FOR CO AND COMBUSTION RATIO CHECK ON COMMISSIONING A CONDENSING BOILER

PRIOR TO CO AND COMBUSTION RATIO CHECK

The installation instructions should have been followed, gas type verified and gas supply pressure/rate checked as required prior to commissioning. 

As part of the installation process, 

ESPECIALLY WHERE A FLUE HAS BEEN FITTED BY PERSONS OTHER THAN THE BOILER INSTALLER

, visually check the integri-

ty of the whole flue system to confirm that all components are correctly asembled, fixed and supported. Check that manufacturer's maximum flue lengths have not

been exceeded and all guidance has been followed (e.g. Gas Safe Technical Bulletin TB008).

The flue gas analyser should be of the correct type, as specified by BS 7967

Prior to its use, the flue gas analyser should have been maintained and calibrated as specified by the manufacturer. The installer must have the relevant competence

for use of the analyser.

Check and zero the analyser IN FRESH AIR as per analyser manufacturer's instructions.

NOTE  

the air gas ratio valve is factory-set and must not be adjusted DURING

COMMISSIONING unless this action is recommended after discussions

with SIME LTD.

If any such adjustment is recommended and further checking of the boiler

is required the installer/service engineer must be competent to carry out

this work and to use the flue gas analyser accordingly.

If the boiler requires conversion to operate  with a different gas family

(e.g. conversion from natural gas to LPG) separate guidance will be provi-

ded by the boiler manufacturer and must be followed.

SET BOILER TO MAXIMUM RATE

Set the boiler to operate at maximum rate (full load condi-

tion). Allow sufficient time for combustion to stablilise. 

NOTE - Do not insert analyser probe during this period

to avoid possible "flooding" of sensor.

CARRY OUT FLUE INTEGRITY CHECK USING ANALYSER

Insert analyser probe into the air inlet test point and allow readings

to stabilise. 

NOTE - The flue must always be installed with flue test point.

This will be located within the first piece connected to the boiler.

Is O

2

less than 

or equal to 20.6% 

and 

CO

2

less than 0.2%

VERIFY FLUE INTEGRITY  

Analyser readings indicate that combustion products and inlet air must be

mixing. Further investigation of the flue is therefore required.

Check that flue components are assembled, fixed and supported as per boi-

ler/flue manufacturer's instructions.

Check that flue and flue terminal are not obstructed. 

Is O

2

less than 

or equal to 20.6% 

and 

CO

2

less than 0.2%

CHECK CO AND COMBUSTION RATIO  AT MAXIMUM RATE

With boiler still set at maximum rate, insert analyser probe into

flue gas samplng point. Allow readings to stablise before recording.

Turn off appliance and call SIME

LTD Technical HelplIne for advice.

the appliance must not be com-

missioned or used, until problems

are identified and resolved.

Is CO less than 350ppm 

AND 

CO/CO

2

ratio less than 0.004 

Check all seals around the appliance

burner, internal flue seals, door and

case seals. Rectify where necessary.

SET BOILER TO MINIMUM RATE

In accordance with boiler instructions, set boiler to operate at

minimum rate (to minimum load condition). Allow sufficient time for

combustion to stablilise. 

NOTE: If manufacturer's instructions do not specify how to set

boiler to minimum rate contact Technical Helpline for advice.

CHECK CO AND COMBUSTION RATIO AT MINIMUM RATE

With boiler set at minimum rate, insert analyser probe into flue gas

samplng point. Allow readings to stablise before recording.

NOTE - if no flue gas sampling point is present and the correct pro-

cedure is not specified in the manual, contact SIME LTD Technical

Helpline for advice.

Is CO less than

350ppm 

AND

CO/CO

2

ratio 

less than 0.004

Turn off appliance and call SIME LTD

Technical HelplIne for advice.

the appliance must not be commissio-

ned or used until problems are identi-

fied and resolved.

NOTE

Check and record CO and combustion

ratio at both maximum AND minimum

rate before contacting  SIME LTD.

Is CO less than 350ppm 

AND 

CO/CO

2

ratio 

less than 0.004 

BOILER IS OPERATING SATISFACTORILY 

no further actions required

Ensure test points are capped, boiler case is correctly repleced and all other commissioning pro-

cedures are completed.

Complete Benchmark Checklist, recording CO and combustion ratio readings as required.

NO

YES

YES

NO

NO

YES

YES

NO

NO

YES

Содержание MIA-30

Страница 1: ...838 INSTALLATION AND SERVICING INSTRUCTIONS ENSURE THAT THESE INSTRUCTIONS ARE LEFT FOR THE USER AFTER COMPLETION OF THE BENCHMARK SECTION PLEASE READ THE IMPORTANT NOTICE WITHIN THIS GUIDE REGARDING...

Страница 2: ...into its installation location Manoeuvring the boiler may include the use of a sack truck and involve lifting pushing and pulling Caution should be exercised during these operations Operatives should...

Страница 3: ...3...

Страница 4: ...ssioning instructions for filling in the checklist at the back of this installation guide Note All Gas Safe registered installers carry a ID Card You can check your installer is Gas Safe Registered by...

Страница 5: ...ign Directive 2009 125 EC Regulation UE N 811 2013 813 2013 Energy labelling Regulation EU No 2017 1369 SYMBOLS a WARNING To indicate actions which if not carried out correctly can result in injury of...

Страница 6: ...on guide If the power cable is damaged replace it with a cable ordered as a spare part with the same characteristics type X Assembly must be by carried out by a qualified professional m WARNINGS It is...

Страница 7: ...he safety or adjustment devices without authorization and in structions from the manufacturer d DO NOT To block the condensate drain To pull detach or twist the electrical cables coming out of the app...

Страница 8: ...8...

Страница 9: ...S SAFE REGISTERED BY CALLING ON 0800 408 5500 OR ALTERNATIVELY WWW GASSAFEREGISTER CO UK 1 USING THE BOILER MIA 30 10 1 1 Control panel 10 1 2 Preliminary checks 11 1 3 Ignition 11 1 4 Adjusting the d...

Страница 10: ...he boiler is op erating in Summer mode or if only the domestic hot water mode is enabled via the remote control If the symbols l and n are flashing this indicates that the chimney sweep function is ac...

Страница 11: ...set the main system switch to ON ON Fig 3 on the display check that the operating mode on the dis play is SUMMER land if necessary select it by pressing and holding the button s for at least 1 second...

Страница 12: ...ibed here contact a qualified technical professional 2 SHUTDOWN 2 1 Temporary shutdown To temporarily interupt the boiler operation press and hold the button s for at least one second once if in WINTE...

Страница 13: ...t on pro tective gloves 3 2 1 Cleaning the case When cleaning the cladding use a cloth dampened with soap and water or alcohol for stubborn marks d DO NOT Do not use abrasive products 4 DISPOSAL 4 1 D...

Страница 14: ...14...

Страница 15: ...E APPLIANCE 16 5 1 Characteristics 16 5 2 Check and safety devices 16 5 3 Identification 16 5 4 Structure 17 5 5 Technical features 18 5 6 Main water circuit 19 5 7 Sensors 20 5 8 Expansion vessel 20...

Страница 16: ...te the appliance with safety devices which do not work or which have been tampered with a WARNING Safety device may only be replaced by professional qualified personnel using Sime Ltd original spare p...

Страница 17: ...trol panel 10 Domestic hot water heat exchanger 11 Gas valve 12 Pressure gauge 13 Flow meter 14 System relief valve 15 Boiler drain 16 Pump 17 Water pressure switch 18 Automatic bleed valve 19 Fan 20...

Страница 18: ...Minimum heat input kW 4 8 D H W flow rate T 30 C l min 14 2 Continuous D H W flow rate T 25 C T 35 C l min 17 5 12 5 Minimum D H W flow rate l min 2 Max Min Pressure bar 7 0 5 kPa 700 50 ENERGY PERFO...

Страница 19: ...4 13 15 16 18 19 10 9 7 11 17 20 12 6 M U G E R Sc S 8 2 1 21 22 23 24 Fig 12 KEY M System flow R System return U Domestic hot water outlet E Domesti hot water inlet S Safety valve outlet G Gas supply...

Страница 20: ...cs Description U M MIA 30 Total capacity l 7 0 Prefilling pressure kPa 100 bar 1 0 Useful capacity l 4 45 Maximum system content l 110 Conditions of Average operating temperature 70 C with high temper...

Страница 21: ...op erating in Summer mode or if only the domestic hot water mode is enabled via the remote control If the symbols l and n are flashing this indicates that the chimney sweep function is active n WINTE...

Страница 22: ...SY HOME or HOME or HOME PLUS remote control alternative to TA1 To connect the TA remove the jumper between terminals 5 6 Fig 15 m CAUTION Installer must Connect the boiler to a 230v 50Hz single phase...

Страница 23: ...23...

Страница 24: ...tions by competent persons and that it meets the require ments of the appropriate Building Regulations The Benchmark Checklist can be used to demonstrate compliance with Building Regulations and shoul...

Страница 25: ...ional 28 6 10 Condensate outlet collection 28 6 11 Gas supply 28 6 12 Connecting the flue 29 6 12 1 Flue Terminal Positions 29 6 12 2 Installation of coaxial flues 60 100mm 80 125mm 30 6 12 3 Installa...

Страница 26: ...the appliance is to be handled manually tilting it slightly lifting it and applying pres sure in the points indicated in the figure Fig 18 d DO NOT To grip the appliance casing Hold the solid parts o...

Страница 27: ...amage to pump and valves boiler noise and circulation problems Before connecting the boiler the associated central heating system must be flushed in accordance with the guidelines given in BS 7593 Tre...

Страница 28: ...eel is NOT suitable It should be noted that the connec tion of a condensate pipe to a drain may be subject to local building control requirements Dealing with Condensate see Appendix 1 6 11 Gas supply...

Страница 29: ...e a nuisance should be avoided 75 mm 200 mm 75 mm 300 mm 1 200 mm 600 mm 300 mm 600 mm 1 200 mm 300 mm 3 in 8 in 3 in 12 in 48 in 24 in 300 mm 12 in 12 in 24 in 48 in 300 mm 12 in 1 500 mm 300 mm 300...

Страница 30: ...lled a diameter of 80 125 code 8095970 reduces the available length by 1 0 metres HORIZONTAL FLUES MUST BE LEVEL NOTE Before connecting accessories it is always advisable to lubricate the internal par...

Страница 31: ...let exhaust fitting code 8091401 10 Articulated tile code 8091300 11 Vertical roof terminal code 8091204 13 Inlet exhaust fitting code 8091401 14 Coaxial Terminal code 8091204 1 10 This loss includes...

Страница 32: ...thermostat timer or a dedicated control listed below For connection de tails see section External timers and Room Thermostats DESCRIPTION CODE External sensor kit 3435 NTC 10KOhm at 25 C 8094101 Power...

Страница 33: ...er the mains power is disconnected by setting the main system switch to OFF Sime Ltd declines all responsible for any injury or damage to persons animals or property as a result of failure to provide...

Страница 34: ...nsor and room ther mostat R M SE TA CR Fig 32 MULTI ZONE system with zone valve room thermostat and external sensor TA TZ1 VZ1 VZ2 VZ3 TZ2 TZ3 SE R M Fig 33 m CAUTION Set the parameter tS 1 7 DELAY SY...

Страница 35: ...the primary heat exchanger 3 8 5 4 9 Fig 38 NOTE to completely remove all air from the system it is rec ommended that this operation is repeated a number of times check the pressure on the pressure g...

Страница 36: ...r press and hold down the buttons o and at the same time for approximately 12 seconds until the flashing symbols l and n appear on the display as soon as the symbols begin to flash release the button...

Страница 37: ...splayed 7 4 List of parameters Type No Description Range U M Step Default CONFIGURATION tS 0 1 Index showing boiler power in kW 1 30 kW 1 tS 0 2 Hydraulic configuration 0 combi 1 system 2 N A 3 N A 4...

Страница 38: ...dulation AU Automatic 30 100 10 AU tS 4 1 T Modulating pump delivery Return 10 40 C 1 20 tS 4 2 Select heat pump or boiler convenience only if tS 0 2 6 20 30 C 5 tS 4 3 Heat pump boiler aid activation...

Страница 39: ...SPLAYED Type No Description Range U M Step CO 0 0 total no of boiler operating hours 0 99 h x 1000 0 1 from 0 0 to 9 9 1 from 10 to 99 CO 0 1 total no of burner operating hours 0 99 h x 1000 0 1 from...

Страница 40: ...l position and refit the front panel 2 Now con duct a flue gas analysis as detailed in APPENDIX 2 take a reading of the combustion data and measure the combustion efficiency press the button to make t...

Страница 41: ...shown in Parameter setting and display page 37 and adjust the parameter 15 tS 1 5 to that value Example Heating system with 8 radiators average 1 5 kW per radia tor total heat Requirement 12 kW 8 x 1...

Страница 42: ...regulations Make sure that the system components and pipes are not hot risk of burning a WARNING Before carrying out any interventions described isolate the power supply isolate the gas cock avoid co...

Страница 43: ...ombustion chamber The combustion chamber and the burner do not require any particular maintenance Simply brush them with a soft brush 8 3 3 Checking the ignition detection electrode Check the state of...

Страница 44: ...G20 1 G31 0 or 1 To enter Parameter setting and display refer to the indica tions provided in the specific section Once the parameters in the table have been set you must car ry out the entire phase...

Страница 45: ...k delivery sensor operation and position AL 74 Second delivery sensor fault Check second delivery sensor operation and position AL 77 EV2 SGV current max min absolute limits error Check gas valve and...

Страница 46: ...no what is the maximum central heating output selected kW Dynamic gas inlet pressure mbar C Central heating return temperature C System correctly balanced rebalanced Yes COMBINATION BOILERS ONLY Is t...

Страница 47: ...eer name Company name Telephone No Gas Safe registration No Max rate CO ppm CO CO CO Min rate CO ppm CO CO CO undertaken in accordance with manufacturers instructions and readings are correct yes Gas...

Страница 48: ...48 9 EXPLODED VIEWS Frame...

Страница 49: ...49 Hydraulic assembly...

Страница 50: ...50 Exchanger Combustion...

Страница 51: ...51 Control panel...

Страница 52: ...52 Additional components...

Страница 53: ...53...

Страница 54: ...ing cli 051 6281674 Group air intake C 052 6281667 Front panel insulators A Pos Code Description Advised parts 053 2030249 Gasket 24x17x3 054 6319653 External by pass kit C 055 6265866 C H flow manifo...

Страница 55: ...ork must be a minimum of 19mm ID typically 22mm OD plastic pipe or as per manufacturer s instructions and this should fall a minimum of 45mm per metre away from the boiler taking the shortest practica...

Страница 56: ...ir break is required Key 1 Boiler 2 Visible air break 3 75 mm trap 4 Visible air break and trap not required if there is a trap with a minimum condensate seal of 75 mm incorporated into the boiler 5 S...

Страница 57: ...nimum condensate seal of 75 mm incorporated into the boiler In this case the 100 mm is measured to the trap in the boiler 5 Sink basin bath or shower 6 Open end of condensate discharge pipe direct int...

Страница 58: ...er level end cut at 45 Note the maximum external condensate discharge length is 3 metres 6 Minimum internal diameter 19 mm 7 Pipe size transition 8 Minimum internal diameter 30 mm 9 Water weather proo...

Страница 59: ...used External waste pipes from kitchens utility rooms or bathrooms such as sink basin and bath or shower waste outlets should be insulated with waterproof UV resistant class 0 material terminated bel...

Страница 60: ...4 5 75mm sink waste trap 2 5 4 3 Key 1 Boiler 2 Visible air break at plug hole 3 75 mm sink basin bath or shower waste trap 4 Sink basin bath or shower with 5 Open end of condensate discharge pipe di...

Страница 61: ...ons should be followed The condensate pipe should be run internally as far as possible before going externally and the pipe diameter should be increased to a minimum of 30mm ID typically 32mm OD befor...

Страница 62: ...of 75mm incorporated into the boiler 5 Soil and vent stack 6 Invert 7 450mm minimum upto three storeys 8 Minimum internal diameter 19 mm 9 Pipe size transition point 10 Minimum internal diameter 30mm...

Страница 63: ...ub zero temperatures i e 15 C for 48 hours BS6798 refers to devices that gas BS6798 section 6 3 8 note 4 The boiler manufacturer s instructions will disposal of the condensate Additional Measures meas...

Страница 64: ...wed Insulation Materials Insulation used for external condensate pipes sink or washing machine waste pipes should be of class O grade with an outer coating that is weather proof is recommended for 32m...

Страница 65: ...ate discharge pipe from boiler 2 Pipe size transition point 3 Water weather proof insulation 4 43mm 90 male female bend 5 External rain water pipe into foul water 6 External air break 7 Air gap 8 9 Mi...

Страница 66: ...14 or boiler installation manual for soakaway design requirements any above ground section of condensate discharge pipe should be run and insulated as described above Figure 7 following page shows a s...

Страница 67: ...incorporated into the boiler refer to manufacturers instructions 5 External length of pipe 3 m maximum 6 Open end of condensate discharge pipe direct into gully 25 mm min below grating but above water...

Страница 68: ...be run either above or below round level End cut at 45 3 Diameter 100 mm minimum plastic tube 4 Bottom of tube sealed 5 Limestone chippings 6 Two rows of three 12 mm holes at 25 mm centres 50 mm from...

Страница 69: ...onnected to the boiler Is O2 less than or equal to 20 6 and CO2 less than 0 2 VERIFY FLUE INTEGRITY Analyser readings indicate that combustion products and inlet air must be mixing Further investigati...

Страница 70: ...l combustible consumption GJ 17 C H seasonal energy efficiency 93 D HW energy efficiency 86 Sound power dB A 57 Specific precautionary measures to be adopted at the time of assembly installation or ma...

Страница 71: ...perature regime b P1 7 8 kW At 30 of nominal heat output and low temperature regime 1 97 7 Auxiliary electricity consumption Other items At full load elmax 0 043 kW Standby heat loss Pstby 0 082 kW At...

Страница 72: ...Sime Ltd 1a Blue Ridge Park Thunderhead Ridge Glasshoughton Castleford WF10 4UA Phone 0345 901 1114 Fax 0345 901 1115 www sime co uk Email enquiries sime co uk...

Отзывы: