68
External Connections
Manufacturers Instructions must be referred to when
installing boiler condensate discharge pipes
Figure 7 –
Example of a purpose made soakaway
Key
1
Condensate discharge pipe from boiler
2
Ground (this section of the condensate discharge pipe may be run either above or below
round level); End cut at 45°
3
Diameter 100 mm minimum plastic tube
4
Bottom of tube sealed
5
Limestone chippings
6
Two rows of three 12 mm holes at 25 mm centres, 50 mm from bottom of tube and facing
away from house
7
Hole depth 400 mm minimum by 300 mm diameter
8
Minimum internal diameter 19 mm
9
Pipe size transition point
10
Minimum internal diameter 30 mm
11
Water/weather proof insulation
1
2
10
5
9
4
8
3
7
6
11
October 2018 Issue 1.0
Содержание MIA-30
Страница 3: ...3...
Страница 8: ...8...
Страница 14: ...14...
Страница 23: ...23...
Страница 48: ...48 9 EXPLODED VIEWS Frame...
Страница 49: ...49 Hydraulic assembly...
Страница 50: ...50 Exchanger Combustion...
Страница 51: ...51 Control panel...
Страница 52: ...52 Additional components...
Страница 53: ...53...