3-8
COPAN 400T/TX - Service Manual
8. Install the back of the right side rails (on your left as you are looking into the back of the
cabinet) in the square holes.
9. Install the three cage nuts in the three holes above the rail. These will be used for the cable
management arm later.
R
AILS AND
T
HREE
C
AGE
N
UTS IN THE RIGHT SIDE RAILS
10. The two rails are now installed.
L
EFT SIDE RAILS FOR
AP0
INSTALLED IN THE
C
ABINET
11. Repeat this procedure for Application Processor 1, if applicable.
Содержание COPAN 400T/TX
Страница 1: ...COPAN 400T TX Service Manual Part CPR02858 Revision Level A01 August 2010 ...
Страница 6: ...6 COPAN 400T TX Service Manual ...
Страница 44: ...3 20 COPAN 400T TX Service Manual ...
Страница 56: ...4 12 COPAN 400T TX Service Manual ...
Страница 62: ...5 6 COPAN 400T TX Service Manual ...