
MSK210
Commissioning English
MSK210 · Date
08.02.2018 · Art.
No.
81417 · Mod.
status
41/18
26
Signal
not inverted
inverted
Pin E6
Pin E8
Pin E6
Pin E8
A
3
3
1
1
B
4
4
2
2
+UB
2
2
4
4
GND
1
1
5
5
A/
- - -
- - -
6
6
B/
- - -
- - -
7
7
nc
5 - 7
5 - 9
3
3, 8, 9
Signal
not inverted with
reference signal
inverted with
reference signal
Pin E6
Pin E8
Pin E6
Pin E8
A
3
3
1
1
B
4
4
2
2
I, R
5
5
3
3
+UB
2
2
4
4
GND
1
1
5
5
A/
- - -
- - -
6
6
B/
- - -
- - -
7
7
I/, R/ - - -
- - -
8
8
nc
6, 7
6 - 9
9
Strand cross sections of lines 0.14 ... 0.5 mm².
5 Commissioning
Following correct mounting and wiring you can put the measuring system
into operation by switching on operating voltage.
The measuring system is a component of an incremental measuring system
that must be referenced at a defined position (reference point) to make
absolute measurement possible.
6 Trouble shooting
Below are some typical errors which may occur during installation and
operation:
•
Magnetic tape wrongly mounted, active side below (see chapter
).
viewing side =
plug-in side
plug pin
2
7
6
5
4
3
1
6
7
3
5
2
4
1
8
5
6
9
1
Содержание MSK210
Страница 30: ...MSK210 30...
Страница 31: ...MSK210 31...