background image

4

Figure 7

 

Connection Panel Lower Right Side

Autolite Wiring Diagram

Figure 9

 

   Do or h andle a sse mbly

Note - For best insert operation the flexible vent
installation sho uld no t have  any tight be nds. T ry to
achieve a smooth sweep to the vertical rise.

SURROUND INSTALLATION

The surround supplied with th e insert is adjus tab le in

height so as to allow for many installation perimeters.

1.

After the insert is in position, install left and right surround
sides by attaching them to the two side brackets using the
four 1/4-2 0 bo lts provided. The retainer nuts on the
surround sid es m ay be installed at any vertical position  to
accomm odate the installation.

2.

Slide the surround top panel between the hopper top and
cover. Push the panel down until the screw holes align
with the side legs. Install the (4) #8 screws provided.
Install power cord into the receptacle on the right side of
the insert. Route cord behind surround leg and out to a
ground plus.

AUTOLITE INSTALLATION INSTRUCTIONS

  Th e Auto Lite  Sys tem  is fa cto ry ins talled with th e only
installation  requ irem ents  being  the optiona l therm osta t.

Wall Thermostat Installation:

  The wa ll therm osta t is des igned to autom atically regulate
the ro om  tem pera ture from  the contro l pane l heat s etting to
the “Off” setting based upon room tem perature. Rem ember
to leave the control panel on the "Medium or High" position
when utilizing the wall thermostat feature.

  The following is a step by step procedure for installing the
optional wall therm ostat. Note conne ction terminals on left
side of unit at rear (

Figure 7

). Use 18/2 thermostat wire for

the installation.

a.

Unplug he ater from  wall outlet and 12V DC  power!

b.

Rem ove factory jump wire and hook up thermostat
wires to terminals (

Figure 7

).

c.

Locate thermostat approximately 10 to 12 feet from
heater or in area that requires steady temperature.

d.

Run thermostat wires from heater to thermostat along
wall or u nde r carpet etc. and ho ok wires  to
thermostat terminals.  On new construction you can,
of course, run wire in the walls before sheet rock or
paneling is done.

e.

Reco nnect AC  power.

f.

Make sure all wiring is completed before plugging the
EASYF IRE  Heater b ack  into the wall outlet.

IMPORTANT

 - Any electrical work performed on the

EA SYFIRE H eater should  be done by qualifie d personnel.

Remote Control Thermostat Installation:

  Th e re m ote  therm ostat is  designed to autom atic ally
regulate the room temperature from the control panel heat
setting to the “Off” setting base d upon roo m  temp erature
and  place m ent of the re m ote therm osta t. Rem em ber to
leave the control panel on the "Medium or High" position
when utilizing the wall thermostat feature.

  The following is a step by step procedure for installing the
optional remote thermostat. Note connection terminals on
rear of un it (

Figure 7

).

a.

Unplug he ater from  wall outlet and 12V DC  power!

b.

Mount millivolt style remote receiver box to rear of
stove using double-sided tape.

b.

Rem ove factory jump wire and hook up thermostat
wires to terminals (

Figure 7

).

d.

Re con nec t AC  pow er an d follow  instructions  with
remote thermostat regarding set up.

IMPORTANT

 - Any electrical work performed on the

 EA SYFIRE H eater should  be done by qualifie d personnel.

DOOR HANDLE ASSEMBLY

The door handle and latch must be assembled and
adjusted prior to the operation of the stove.

1. Position hand le ass em bly through d oor a nd s ecu re with

collar by sliding over shaft and tightening with allen
wrench provided.

2. Position latch on end of shaft with flat facing allen screw.

Depending on gasket, shaft will protrude approx. 1/4"
through back of latch collar. Snug allen screw.

3. To  adjust door, close a nd turn ha ndle so latc h co ntac ts

striker. Door gasket must contact firmly against front face
of unit. This can be che cked  by closing against a piece of 
paper. Firm ly tug on paper, if it m oves with  solid
resistance the door is properly adjusted.

All manuals and user guides at all-guides.com

Содержание EF-4001B AutoLite

Страница 1: ...ent cleaning may be required due to fuel quality excessive lint from carpeting bedding material etc It is imperative that control compartm ents burn pot and circulat ing air passageways of the heater...

Страница 2: ...TSIDE COMBUSTION AIR IS MANDATORY IN MOBILE OR MODULAR HOME INSTALLATIONS SEE SECTION ON OUTSIDE AIR INSTALLATION CAUTION DO NOT CONNECT TO ANY AIR DISTRIBUTION DUCT OR SYSTEM INSTALLATION INSTRUCTION...

Страница 3: ...continuing to the top of the chimney If the total vent length is longer than 10 Feet install 4 vent from that point to top of chimney Figure 6 5 Pack fiberglass insulation around the vent pipe and co...

Страница 4: ...t wires from heater to thermostat along wall or under carpet etc and hook wires to thermostat terminals On new construction you can of course run wire in the walls before sheet rock or paneling is don...

Страница 5: ...or partition of combustible construction is desired the installation shall conform the CAN CSA B365 3 Maintain an effective vapour barrier at the location where the chimney or other component penetra...

Страница 6: ...Store pellets in a clean dry area Do not use pellets that have been damp or have a moisture level above 5 The quality of pellet fuel varies from brand to brand This will affect the efficiency of your...

Страница 7: ...ay cause injury DO NOT operate with rear cover removed WARNING Risk of electrical shock disconnect all AC DC power before servicing ALWAYS TURN YOUR Heater OFF LET IT COOL BEFORE CLEANING Your EASYFIR...

Страница 8: ...ir flow has been reduced Check the Fire Pot air intake holes to be sure they are clear Check to see if Fire Pot was properly seated in pot tray Check to see if the manifold may have filled with Fly as...

Страница 9: ...ed before operating unit Maintain hopper seal in good condition DO NOT OVERFILL HOPPER The EASYFIRE will hold about 35 lbs to 50 lbs of pellets depending on hopper height Open the top lid and fill the...

Страница 10: ...ically adjusting the feed and air based on temperature This means the pellet feed rate and flam e height will change accordingly based on quality of pellet and heat loss of dwelling MAINTENANCE PROCED...

Страница 11: ...ishing Gold Plated Parts Gold is a soft metal and therefore a fragile surface Prior to the first burn it is important to use Windex or comparable product and a soft clean cloth to wipe any marks off a...

Страница 12: ...Problem We had a power failure and the heater emitted smoke for about five minutes Solution If the heater emits smoke during a power failure and you have frequent power failures then we suggest you p...

Страница 13: ...FUSE 1 AMP 6B 110510 AUTOLITE FUSE 5 AMP 7 200549 HEAT EXCHANGE COVER 8 110456 ASH DRAWER FIBER ROPE GASKET 9 110451 ASH DRAWER KNOB 10 120117 IGNITOR 200W 11 300512 BURN POT AL V2 12 120120 IGNITOR R...

Отзывы: