Page 3
Copyright
2011 Siemens Industry, Inc.
141-00015, Rev 01
Table of Contents
Important Safety Information
................................................................................ 4
Read this First
.................................................................................................... 4
Symbol Legend
.................................................................................................. 4
Safety Instructions
............................................................................................... 4
The Siemens Microinver System
........................................................................... 4
How the Microinverter Works
.................................................................................. 6
System Monitoring
............................................................................................ 6
Optimal Reliability
............................................................................................ 6
Ease of Design
................................................................................................ 6
Siemens Microinverter Installation
.......................................................................... 7
Compatibility and Capacity
..................................................................................... 7
Parts and Tools Required
...................................................................................... 8
Lightning Surge Suppression
.................................................................................. 8
Installation Procedure
........................................................................................... 9
Step 1 – Measure AC at Service Entrance Conductors
................................................... 9
Step 2 – Install the AC Branch Circuit Junction Box
..................................................... 10
Step 3 – Position the Trunk and Drop Cabling
............................................................ 11
Step 4 – Attach the Microinverters to the Racking
....................................................... 12
Step 5 – Dress the Trunk and Drop Cable
................................................................ 13
Step 7 – Terminate the unused end of the Trunk and Drop Cable
.................................... 15
Step 8 – Connect the Cable to Junction Box(es)
......................................................... 16
Step 9 – Ground the System
................................................................................ 17
Step 10 – Complete the Installation Map
.................................................................. 18
Complete the Siemens Map
.............................................................................. 18
Alternative: Create Your Own Map
..................................................................... 18
Step 11 – Connect the PV Modules
........................................................................ 18
Step 12 – Build the Virtual Array
............................................................................ 19
Commissioning and Operation
............................................................................ 20
Commissioning
................................................................................................. 20
Operating Instructions
........................................................................................ 20
Troubleshooting
............................................................................................. 21
Status LED Indications and Error Reporting
.............................................................. 21
Startup LED Operation:
.................................................................................... 21
Ground Fault Detection Indicator (GFDI) Fault:
....................................................... 21
Other Faults:
................................................................................................ 21
Troubleshooting an Inoperable Microinverter
............................................................. 22
Disconnecting a Microinverter from the PV Module
...................................................... 23
Installing a Replacement Microinverter
.................................................................... 24
Technical Data
............................................................................................... 25
Technical Considerations
.................................................................................... 25
Technical Specifications
...................................................................................... 26
Siemens SMIINV215R60XX Microinverter Operating Parameters
................................. 26
Appendix
...................................................................................................... 28
Limited Warranty
............................................................................................... 28
Siemens Installation Map
.................................................................................... 30
Sample Wiring Diagram – SMIINV215R60XX, 240 Vac or 208 Vac Single Phase
................. 31
Sample Wiring Diagram – SMIINV215R60XX, 208 Vac
................................................ 32
Содержание SMIINV215R60XX
Страница 1: ...Installation and Operations Manual Siemens Microinverter Model SMIINV215R60XX ...
Страница 30: ...Page 30 Copyri Siemens Installation Map Copyright 2011 Siemens Industry Inc Installation Map 141 00015 Rev 01 ...
Страница 32: ...Page 32 Copyright 2011 Siemens Industry Inc 141 00015 Rev 01 Sample Wiring Diagram SMIINV215R60XX 208 Vac ...
Страница 33: ......