
7ML19985CL02
SITRANS LR 300 – INSTRUCTION MANUAL
Page 27
mmm
mm
Inst
allat
ion
Mounting
* Refer to the Rod Extension Requirements table on page 28.
Notes:
• The Integral process seal MUST rest on the customer flange. See detail
showing a correctly mounted unit.
• The straight/taper transition of the rod should extend past the nozzle/vessel opening.
Add extensions as required
∗
.
WARNING: The user is responsible for the selection of bolting and
gasket materials which will fall within the limits of the flange and
its intended use and which are suitable for the service conditions.
WARNING: Improper installation may result in loss of process
pressure.
1/2" NPT
or M 20 x 1.5
conduit entries
Straight/taper Transition
Nozzle/Vessel
Juncture
Integral Process Seal
Customer Flange
Customer-flanged
Nozzle to suit
Wiring access
cover
Minimum diameter
2" / DIN 50
Tank
Correctly Mounted Unit
Improperly Mounted Unit
Process seal should rest on flange
A
SITRANS LR 300.book Page 27 Monday, June 10, 2002 7:18 PM
Содержание SITRANS LR 300
Страница 1: ...SITRANS LR 300 Instruction Manual ITRANS LR 30 July 2002 ...
Страница 14: ...Page 12 SITRANS LR 300 INSTRUCTION MANUAL 7ML19985CL02 mmmmm Specifications ...
Страница 46: ...Page 44 SITRANS LR 300 INSTRUCTION MANUAL 7ML19985CL02 mmmmm Start Up ...
Страница 96: ...Page 94 SITRANS LR 300 INSTRUCTION MANUAL 7ML19985CL02 mmmmm Troubleshooting ...
Страница 136: ...Page 134 SITRANS LR 300 INSTRUCTION MANUAL 7ML19985CL02 mmmmm Appendix VIII ...
Страница 139: ......
Страница 140: ... 7ml19985cl02 Siemens Milltronics Process Instruments Inc 2002 Subject to change without prior notice Rev 2 4 ...