Function
2.2 Protection
SIPROTEC, 7VU681, User Manual
C53000-G1176-C368-1, Release Date 07.2012
54
2.2.4
Earth O/C for Busbar Energization Protection
This device supplies 2 stages of definite time ground overcurrent for busbar energization.
Figure 2-28
Logic Diagram of the Earth Overcurrent for Busbar Energization Protection
1. When the parameter
9030 Earth O/C
for Busbar Energization is set to
ON
and bus-tie CB is closed, Earth
overcurrent for busbar energization protection will start to run. The running time is set by the parameter
9019A Active Time
for Busbar Energization.
2. Earth voltage contorl can be enabled or disabled by setting the parameter
9031 3U0 Control
to
YES
or
NO
.
3. PT broken wire cannot block earth overcurrent for busbar energization protection.
4. After the trip signal is released, the dropout of the voltage signal cannot reset the trip signal, only current
dropout can reset the trip signal.
Содержание SIPROTEC 7VU681
Страница 8: ...Preface SIPROTEC 7VU681 User Manual C53000 G1176 C368 1 Release Date 07 2012 8 ...
Страница 12: ...Contents SIPROTEC 7VU681 User Manual C53000 G1176 C368 1 Release Date 07 2012 12 ...
Страница 100: ...Literature SIPROTEC 7VU683 User Manual C53000 G1176 C368 1 Release Date 07 2012 100 ...
Страница 110: ...Appendix A 4 Dimension SIPROTEC 7VU681 User Manual C53000 G1176 C368 1 Release Date 07 2012 110 ...
Страница 112: ...Index SIPROTEC 7VU681 User Manual C53000 G1176 C368 1 Release Date 07 2012 112 ...