Installation
9229 0020 176 0B
39
2019-04-02
Laying the cable harness
• Remove metal cover, refer to Fig. 40.
• Only guide cable harness out of the opening that points behind the rear side of
the pole shells (46).
• Push scoring protector over cable harness, insert until it is in the opening, and
fix with strain relief if necessary.
• Mount metal cover, refer to Fig. 41.
Note
If the cover is made from metal, the low-voltage cable harness must only be guid-
ed out of the opening in the operating mechanism box that faces away from the
pole side.
Fig. 49
Guiding cable harness out of operating mech-
anism box
Fig. 50
Positioning scoring protector in the opening
Содержание SION 3AE6113-0
Страница 10: ...Transport storage and packing 10 9229 0020 176 0B 2019 04 02 Blank page ...
Страница 44: ...Installation 44 9229 0020 176 0B 2019 04 02 Blank page ...
Страница 50: ...Operation 50 9229 0020 176 0B 2019 04 02 Blank page ...
Страница 54: ...Maintenance 54 9229 0020 176 0B 2019 04 02 Blank page ...
Страница 58: ...58 9229 0020 176 0B 2019 04 02 Blank page ...
Страница 59: ...9229 0020 176 0B 59 2019 04 02 Blank page ...