11.Release the grounding screw
①
, to remove the protective conductor.
12.To remove the I/O module, release the fixing screws.
13.Note down the address set with DIP switch S1 on the defective module.
4.6.6
This is how you install the PP 72/48D 2/2A PN
Installing
Procedure:
1. Set DIP switch S1 of the new module as you previously noted down.
2. Install the new I/O module.
3. Connect the ground connection.
4. Connect the communication cables at interface X2 (port 1 and port 2).
5. Re-establish the strain relief for the communication cables.
6. Re-insert the connectors of the ribbon cables (X111, X222, X333) on the module that are
used to connect the digital inputs and outputs.
7. Reconnect power supply X1.
8. Close the cabinet and switch-on the system again.
DIP switch S1
Setting of switch S1:
1
2
3
4
5
6
7
8
9
10
Device name
ON
ON
ON
OFF
OFF
ON
OFF
OFF
OFF
OFF
pp72x48pn9
OFF
OFF
OFF
ON
OFF
OFF
OFF
OFF
pp72x48pn8
ON
ON
ON
OFF
OFF
OFF
OFF
OFF
pp72x48pn7
OFF
ON
ON
OFF
OFF
OFF
OFF
OFF
pp72x48pn6
ON
OFF
ON
OFF
OFF
OFF
OFF
OFF
pp72x48pn5
The switch positions 9 and 10 guarantee the PROFINET functionality of the module and must always be switched "ON".
Note
A new address only becomes effective after voltage OFF → ON.
Service cases - hardware
4.6 I/O modules
Software and hardware
Service Manual, 08/2018, 6FC5397-5DP40-6BA1
117
Содержание SINUMERIK 828D Turning
Страница 9: ...Index 245 Table of contents Software and hardware Service Manual 08 2018 6FC5397 5DP40 6BA1 9 ...
Страница 10: ...Table of contents Software and hardware 10 Service Manual 08 2018 6FC5397 5DP40 6BA1 ...
Страница 244: ...Appendix A 3 Documentation overview SINUMERIK 828D Software and hardware 244 Service Manual 08 2018 6FC5397 5DP40 6BA1 ...