Service and maintenance
5.1 Maintenance
Power Module PM240-2
68
Hardware Installation Manual, 01/2020, A5E33294624B AL
5.1
Maintenance
The purpose of maintenance is to maintain the specified condition of the Power Module.
Regularly remove dirt and pollution, and replace the fan in plenty of time.
Cleaning
Converters with IP20 degree of protection - built-in units
Clean the converter with an anti-static brush, a vacuum cleaner and areas that are difficult to
access, using dry compressed air (max. 1 bar).
Converters with push-through technology – PT devices
Clean the heatsink at regular intervals. If necessary, remove the air deflection plate at the
rear. Use a torque of 2 Nm when reconnecting. The fans must be installed if you clean the
heatsink using water.
Ventilation
The devices must be installed in a cabinet. Ensure that the cabinet's ventilation slots are not
blocked. Check that the fan is functioning correctly.
Cables and screw terminals
Regularly check the cables for damage, and immediately replace any defective parts.
Regularly check that the screw terminals have been correctly tightened. Retighten the
screws if necessary.
Note
The actual maintenance intervals depend on the installation and operating conditions.
Siemens offers its customers support in the form of service contracts. For further information,
contact your Siemens regional office or sales office.
Содержание SINAMICS G120
Страница 1: ...Power Module PM240 2 ...
Страница 2: ......
Страница 6: ...Preface Power Module PM240 2 4 Hardware Installation Manual 01 2020 A5E33294624B AL ...
Страница 10: ...Table of contents Power Module PM240 2 8 Hardware Installation Manual 01 2020 A5E33294624B AL ...
Страница 116: ...Technical data 6 9 Service life Power Module PM240 2 114 Hardware Installation Manual 01 2020 A5E33294624B AL ...
Страница 118: ...Spare parts Power Module PM240 2 116 Hardware Installation Manual 01 2020 A5E33294624B AL ...
Страница 175: ......
Страница 176: ......