Installing
3.4 Mounting the Power Modules
Power Module PM240P-2
Hardware Installation Manual, 06/2020, A5E37800827C AD
29
Table 3- 2
Drilling dimensions, cooling air clearances and fixing
Frame
size
Drilling dimensions [mm]
Cooling air clearances [mm]
1)
Fixing / torque [Nm]
h
b
c
Top
Bottom
Front
FSD
430
170
7
300
350
100
4 x M5 / 6.0
FSE
509
230
8.5
300
350
100
4 x M6 / 10
FSF
680
270
13
300
350
100
4 x M8 / 25
1)
The Power Module is designed for mounting without any lateral cooling air clearance. For toler-
ance reasons, however, we recommend a lateral clearance of approx. 1 mm
3.4.3
Hoisting gear
Use crane lifting lugs and the appropriate
hoisting gear when mounting built-in devices.
Power Module weights:
Technical data (Page 53)
Содержание SINAMICS G120 PM240P-2
Страница 1: ...Power Module PM240P 2 ...
Страница 2: ......
Страница 102: ...Appendix A 3 Abbreviations Power Module PM240P 2 100 Hardware Installation Manual 06 2020 A5E37800827C AD ...
Страница 105: ......
Страница 106: ......