SIMATIC Field PG M6
Operating Instructions, 12/2018, A5E43198909-AA
29
Installing and connecting the device
4
4.1
Preparations
4.1.1
Checking delivery
Unpacking the device
Note the following points when you unpack the unit
●
It is advisable not to dispose of the original packing material. Keep it in case you have to
transport the unit again.
●
Please keep the documentation in a safe place. It is required for initial commissioning and
is part of the device.
●
Check the delivery unit for any visible transport damage.
●
Check the delivery and your specially ordered accessories against the packaging list to
ensure nothing is missing. Please inform your local dealer of any disagreements or
transport damages.