Connecting up
4.7 Functional ground
SCALANCE XP-200
Operating Instructions, 05/2016, C79000-G8976-C428-01
65
Connecting up functional ground
①
Grounding terminal with cable
②
Screw (M4 thread) with spring washer and washer
Follow the steps below to connect the functional ground:
1.
Put the grounding terminal
①
, and the bolt
②
together as shown in the drawing.
2.
Screw in the bolt
②
with a maximum tightening torque of 1.5 Nm.
Содержание SCALANCE XP-200
Страница 8: ...Introduction SCALANCE XP 200 8 Operating Instructions 05 2016 C79000 G8976 C428 01 ...
Страница 50: ...Installation 3 5 Rack mounting SCALANCE XP 200 50 Operating Instructions 05 2016 C79000 G8976 C428 01 ...
Страница 66: ...Connecting up 4 7 Functional ground SCALANCE XP 200 66 Operating Instructions 05 2016 C79000 G8976 C428 01 ...
Страница 84: ...Dimension drawings SCALANCE XP 200 84 Operating Instructions 05 2016 C79000 G8976 C428 01 ...
Страница 92: ...Approvals SCALANCE XP 200 92 Operating Instructions 05 2016 C79000 G8976 C428 01 ...