105/245
Building Technologies Division
Basic Documentation LME7...
CC1P7105en
Infrastructure & Cities Sector
16 PME73.820...
29.11.2011
16 PME73.820...
16.1 Program sequence PME73.820...
For connection diagram fuel train (G)
7105d75e/1111
M
Z
V1
V2a
AL
K1
X2-02 Pin 3
A
ctu
a
to
r p
os
iti
on
High-fire
Cam V2
Ignition load / low-fire
CLOSE
R
LR-OPEN
LR-CLOSE
LP
Pmin
P LT
ION / QRA
Not active
X3-04 Pin 5
Relay
contact Function / inputs
Display and operating unit parameter number
LED permanent
LED flashing
tw t11 t10 t12 t3 t3n t4
t8
td4 td1 td3 td2
Standby
Startup
Operation
Shutdown
Valve proving
If parameter
P241.00 =1 (ON)
Can be
parameterized
t1 TSA
259 225 260 226 257
234
Relay
contact Function / outputs
SK
X3-04 Pin 1
X5-03 Pin 1
X5-03 Pin 3
X65 Pin 1
X5-03 Pin 2
X65 Pin 1
X3-02 Pin 1
X5-01 Pin 2
X2-02 Pin 4
X9-04 Pin 2
K1
X6-03 Pin 3
K4
X2-01 Pin 3
K5
X4-02 Pin 3
K7
X7-04 Pin 4
X7-01 Pin 3
K2/1
X2-03 Pin 3
21 22 24 22 30 30 36 38 40 42 44
72 74 10
80 81 82 83
oP1
74
224
t11
POC
POC
240 240 240 240 240 240
242 243 244 245
t11
t12
SV
V2
K9
X7-02 Pin3
SA-KL
K12
X2-09 Pin 2
SA-NL
K11
X2-09 Pin 3
SA-Z
X2-09 Pin 1
SA-R
X2-09 Pin 4
Input from cam V2
X2-09 Pin 8
Output from cam V2
X2-09 Pin 7
K2/2
*)
*)
*)
*)
Phase number AZL2...
Phase number 7 segment in the LME...
21 22 24 22 30 30 36 38 40 42 44
72 74 10
80 81 82 83
oP:P1
74
230
Not active
Not active
*)
*1
*2
Figure 46: Program sequence PME73.820... for connection diagram fuel train (G)
*) During the actuator running phases, the actuator feedback signal must be OFF first, then ON.
*1 Valve proving, if P241.00 = 1 after mains ON, lockout, P234 (postpurge time t8) P241.01 = 0 second or
*2 Valve proving, if P241.00 = 1 and P234 (postpurge time t8) >0 second and P241.01 = 1