Installation
PXL Conventional Fire Alarm Control Panel
33
TB2, BAT+
Battery
TB2, BAT-
Battery
TB2, NAC PWR+
AUX PWR for NACs
TB2, NAC PWR-
AUX PWR for NACs
TB3, AUX +
AUX PWR
TB3, AUX -
AUX PWR
TB4, all terminals
NACs
TB5
Serial Bus
TB6
Alarm Relay
TB6
Supervisory Relay
TB6
Trouble Relay
NOTE:
When 2 PPS-10M power supplies are installed
in a PXL System, follow the steps below:
1. Disable the Serial Bus, TB5, on the second
PPS-10M. Connect the field wires to TB5 of
the first PPS-10M only (module 1).
2. Cut Jumper JP3 on the second PPS-10M.
3. Cut and remove the red wires from the 15"
cable in the PCK-1 kit (P/N 500-695066)
when connecting between the two PPS-10Ms.
4. Refer to Appendix E for cabling connections
in a PSE-2 Enclosure.
Wiring to the PNC-2Z
Refer to Table 11. Dress the field wiring that will be going to the
PNC-2Z terminals. Strip the insulation from the wiring and connect
the wires to the appropriate screw terminals.
TABLE 11
WIRING TO THE OPTIONAL PNC-2Z
Screw Terminal
Application
TB1, all terminals
NACs
TB2, all terminals
NACs
TB3, all terminals
AUX PWR for NACs
Technical Manuals Online! - http://www.tech-man.com
firealarmresources.com