![Siegenia AEROPAC Скачать руководство пользователя страница 9](http://html1.mh-extra.com/html/siegenia/aeropac/aeropac_original-operating-instructions_1265138009.webp)
Original operating instructions
AEROPAC
07.2019
37
DEUTSC
H
EN
GLISH
FRAN
Ç
AIS
IT
ALIAN
O
NEDERL
ANDS
POL
SKI
РУССКИЙ
6.5 Drilling the mounting holes and inserting the fixing screws
1. Drill the two marked mounting holes and, if
required, the additional mounting hole (B)
(all drilled holes should have a diameter of
8 mm and be at least 45 mm deep).
90°
B
2. Insert two dowels into the drill holes. If
necessary, insert a further dowel into the
additional mounting hole (B).
Note:
Depending on the type of wall
(e.g. plasterboard), suitable dowels may
need to be provided by the customer for
inserting into the drill holes.
3. Screw two screws up to 8 mm in the
dowels.
B
8
6.6 Inserting the ventilation pipe into the core bore hole
1. Trim the pipe to wall thickness (dimension
X
).
2. Slide the ventilation pipe into the core bore
hole (so that both ends are flush with the
wall).
X
X
Содержание AEROPAC
Страница 27: ......