6.6.1 Recommendation for installation of the ventilation pipe
The connection joint between the ventilation pipe and the core bore hole must be properly sealed
inside the room and outside.
Please note the following:
• Ensure that the gap to be sealed is wide enough to allow for movement in the materials.
• Insulate the connection joint (heat insulation)
• Seal the connection joint on the outside so that it is resistant to driving rain
• Seal the connection joint inside the room so that it is air-tight
• The following principle applies: “Inside tighter than outside”
6.6.2 Thermal insulation
For gaps > 6 mm, it is essential that the insulation is free of voids and suitable insulating material is
used for all wall systems.
Clean the connection joints. Ensure that the holding surfaces are clean and free of grease. In
particular, remove any residues of insulating material.
Insert the insulating
material
Core drill hole
e. g. Ø 93
Gap width > 6
Ventilation
pipe Ø 80
Содержание AEROPAC