Sidekick SK-8RG Скачать руководство пользователя страница 7

7

SPECIAL FUNCTIONS

Selected with PLUS when machine is turned ON.

DRY will turn on drier for 15 minutes.

DRAIN will empty the internal HEAT TANK and the PROCESS DRUM.

FLUSH cleans out the system.

CLEAN LINES is a major cleaning. It draws solution through each of the chemical tubes,
one at a time, starting with tube #18 through #1 and then does a FLUSH using #5 as a
water source.

All solution tubing should be removed and the water tubing moved manually from
position to position, as the unit draws water through each tube to clean itself.

TEMP CALIBRATE will load water into the heat tank, heat it and hold the temperature at
37.8 

o

C (100  

o

F). The unit will emit a beep every time it reaches the proper temperature.

Allow 15 minutes after the first beep before reading temperatures. Check the temperature
with a digital thermometer (an electronic fever thermometer works great) with the probe
near the stir rod but not touching the bottom of the heat tank. A glass or dial
thermometer will not work.

The temperature can be adjusted with a small screwdriver through a hole on the left side
of the unit. Clockwise to decrease temperature

. All units are calibrated at the factory and

should not need adjustment in the field.

The DRUM Temperature sensor can be tested by holding MINUS when “Temp Calibrate”
is displayed and pushing START. The bottom display line shows 2 Hex numbers. The first
Hex number refers to the DRUM temperature sensor. At room temperature (70 

o

F, 21 

o

C)

the Hex number should be B5,B6,B7,B8,B9 or BA. The important thing is that it should
not vary by more than 2 on any successive reading.

MAINTENANCE

Wipe off all spills when they occur.

Keep the stainless contact plates on the DRUM clean. Never touch with fingers. Clean
daily with alcohol and buff with Scotch Brite

tm

. Bend in the contactor springs on the body

periodically.

Use silicone grease to lubricate the “O” ring on the SNOUT of the processing DRUM as
needed.

Inspect the plastic sleeve on the STAPLE that turns the spindle - replace if worn.

Содержание SK-8RG

Страница 1: ...4 Processing 10 Push processing 5 Drying 10 Disc processing 6 Reel loading 11 4x5 processing 7 Special functions 12 Automatic replenishing 7 Maintenance 15 Service 8 Alarms and messages 18 Parts list...

Страница 2: ...sses are pre programmed but the developer time can be easily changed when desired The SK 8RG protects the film from possible operator errors It has an interactive computerized display that prompts and...

Страница 3: ...can run in any direction Allow about 2 feet 60 cm extra for slack Label both ends of the tubing with the chemical name Slip one end over the proper tube and the other end over the exposed black tubing...

Страница 4: ...close to unit Fig 1 Run tubing directly to DUMP bottle Fig 1 Cut off unneeded length of dump tubing Fig 1 Run the DUMP and the FLUSH tubing separately into the 3 gray fitting on the DUMP bottle Do not...

Страница 5: ...ols the warm air blowing on the DRUM This fine tunes the solution to an accurate temperature for very consistent results When one solution is finished it is drained out and the prepared solution in th...

Страница 6: ...y Paterson tm reels will work They are available at most photo stores Contact Photo Therm if you prefer to use different style reels 35 MM FILM Cut off the film leader Clip the corners of the leading...

Страница 7: ...d but not touching the bottom of the heat tank A glass or dial thermometer will not work The temperature can be adjusted with a small screwdriver through a hole on the left side of the unit Clockwise...

Страница 8: ...NOT TURN UNIT OFF until you check why A continuous series of short buzzes signals that the unit requires attention Read the message in the display to find out what needs to be done Check Dev etc mean...

Страница 9: ...tone Run for at least 2 hours a day The bleach is SAVED in this process because of its cost If you wish to save a different chemical let us know Check reversal for scum growth discard clean bottle re...

Страница 10: ...plastic and process normally DISC DRYING When the processor says INSERT PLUG push the disc dryer assembly into the coupling as if it was a normal processing DRUM Insert the cord from the dryer into t...

Страница 11: ...other hand to help guide the sheets After all the sheets have been loaded rotate the stainless clips toward the outside ring to hold in the sheets The spindle should then be inserted from the bottom o...

Страница 12: ...nishment rate The REPLENISHING BOTTLE contains both the used solution and the fresh replenisher solution The replenishing solution is held in the internal BLADDER which equalizes solution heights for...

Страница 13: ...13...

Страница 14: ...a red tinge increase the bleach replenishment rate and or make sure the bleach is aerated You can usually re bleach the film to correct the problem CALIBRATING THE METERING VALVE If you wish to check...

Страница 15: ...ing while the spindle is being pulled in Adjust by mounting the STAPLE closer to the motor Machine failure message Temperature sensor problem Check ribbon connector from heat tank Make sure it is push...

Страница 16: ...16...

Страница 17: ...he clamp With a paper towel in hand remove the SV tubing from the pump fitting Remove the ribbon connector of the SV from the PC board Carefully lift the connector straight up Do not bend the pins The...

Страница 18: ...and wipe up any loose solutions Tie down the 2 pumps through the holes in the base with strong twine Remove the magnetic stirrer white pill from inside the heat chamber Close the unit Remove and keep...

Страница 19: ...19 blank sheet for page count insert wiring diagram...

Страница 20: ...553 2001 Porters Get catalog Has Rexton Hyperwet 35 0597 a B W rinse 708 833 0300 McMasters Ask for catalog Has silicone grease 1418K4 800 537 9724 United Plastics Ask for catalog Good source for bot...

Отзывы: