Sidekick SK-8RG Скачать руководство пользователя страница 4

4

SETTING UP THE UNIT Cont.

There are five drain outlets in the back of the unit:

1.

DUMP - For spent chemistry. Connect to DUMP bottle or plumbed-in drain.

2.

FLUSH - Disposes of spent FLUSH water. Connect to DUMP bottle or drain.

3.

SAVE  FIX - Recovers the solution to be saved. Active only when SAVE switch is   

           on (red is showing). Connect to separate bottle.

4.       SAVE BLEACH - Recovers solution to be saved. Active when SAVE switch is on.     
               Connect to separate bottle.
5.

OVERFLOW - DO NOT CONNECT. If solution comes out of this outlet, check your 

            FLUSH tubing for proper installation.

Push the flexible tubing over the stainless tubes of these outlets (no more than 3/4”).

Position DUMP bottle close to unit. (Fig. 1)

Run tubing directly to DUMP bottle. (Fig. 1)

Cut off unneeded length of dump tubing. (Fig. 1)

Run the DUMP and the FLUSH tubing separately into the 3” gray
fitting    on the DUMP bottle. Do not put a third tubing into the same

fitting.

Do NOT run tubing inside DUMP bottle. (Fig. 2). Allow at least 12” drop between unit and
DUMP bottle.

Open the DOOR by lifting up from the bottom and pulling out. Place the magnetic stirrer
(white pill) in the exposed heat tank. Carefully push the stirrer with a pencil until it is
magnetically caught near the back right corner of the tank.  Turn SIDEKICK on and
check if the stirrer is turning.

Put in six Alkaline “C” Cells in the battery holder. This will allow the unit to continue after
a power failure and protect it against power surges. Plug the power cord into a 120 Volt
AC 15 Amp. (regular domestic) outlet. 

VERY,

  VERY,

IMPORTANT!

Содержание SK-8RG

Страница 1: ...4 Processing 10 Push processing 5 Drying 10 Disc processing 6 Reel loading 11 4x5 processing 7 Special functions 12 Automatic replenishing 7 Maintenance 15 Service 8 Alarms and messages 18 Parts list...

Страница 2: ...sses are pre programmed but the developer time can be easily changed when desired The SK 8RG protects the film from possible operator errors It has an interactive computerized display that prompts and...

Страница 3: ...can run in any direction Allow about 2 feet 60 cm extra for slack Label both ends of the tubing with the chemical name Slip one end over the proper tube and the other end over the exposed black tubing...

Страница 4: ...close to unit Fig 1 Run tubing directly to DUMP bottle Fig 1 Cut off unneeded length of dump tubing Fig 1 Run the DUMP and the FLUSH tubing separately into the 3 gray fitting on the DUMP bottle Do not...

Страница 5: ...ols the warm air blowing on the DRUM This fine tunes the solution to an accurate temperature for very consistent results When one solution is finished it is drained out and the prepared solution in th...

Страница 6: ...y Paterson tm reels will work They are available at most photo stores Contact Photo Therm if you prefer to use different style reels 35 MM FILM Cut off the film leader Clip the corners of the leading...

Страница 7: ...d but not touching the bottom of the heat tank A glass or dial thermometer will not work The temperature can be adjusted with a small screwdriver through a hole on the left side of the unit Clockwise...

Страница 8: ...NOT TURN UNIT OFF until you check why A continuous series of short buzzes signals that the unit requires attention Read the message in the display to find out what needs to be done Check Dev etc mean...

Страница 9: ...tone Run for at least 2 hours a day The bleach is SAVED in this process because of its cost If you wish to save a different chemical let us know Check reversal for scum growth discard clean bottle re...

Страница 10: ...plastic and process normally DISC DRYING When the processor says INSERT PLUG push the disc dryer assembly into the coupling as if it was a normal processing DRUM Insert the cord from the dryer into t...

Страница 11: ...other hand to help guide the sheets After all the sheets have been loaded rotate the stainless clips toward the outside ring to hold in the sheets The spindle should then be inserted from the bottom o...

Страница 12: ...nishment rate The REPLENISHING BOTTLE contains both the used solution and the fresh replenisher solution The replenishing solution is held in the internal BLADDER which equalizes solution heights for...

Страница 13: ...13...

Страница 14: ...a red tinge increase the bleach replenishment rate and or make sure the bleach is aerated You can usually re bleach the film to correct the problem CALIBRATING THE METERING VALVE If you wish to check...

Страница 15: ...ing while the spindle is being pulled in Adjust by mounting the STAPLE closer to the motor Machine failure message Temperature sensor problem Check ribbon connector from heat tank Make sure it is push...

Страница 16: ...16...

Страница 17: ...he clamp With a paper towel in hand remove the SV tubing from the pump fitting Remove the ribbon connector of the SV from the PC board Carefully lift the connector straight up Do not bend the pins The...

Страница 18: ...and wipe up any loose solutions Tie down the 2 pumps through the holes in the base with strong twine Remove the magnetic stirrer white pill from inside the heat chamber Close the unit Remove and keep...

Страница 19: ...19 blank sheet for page count insert wiring diagram...

Страница 20: ...553 2001 Porters Get catalog Has Rexton Hyperwet 35 0597 a B W rinse 708 833 0300 McMasters Ask for catalog Has silicone grease 1418K4 800 537 9724 United Plastics Ask for catalog Good source for bot...

Отзывы: