Sidekick SK-8RG Скачать руководство пользователя страница 3

3

SETTING UP THE UNIT Cont.

Place the unit on a flat level surface. Lift up the side and cut away and discard the two
visible nylon straps from the bottom of the unit. These straps hold the pumps secure for
shipping and must be removed for the pumps to work.

Prepare the solution bottles. a) Loosen 
NUT. b) push in notched end of the ¼ OD
black tubing through fitting to bottom of 
bottle. Leave about 2 inches (5 cm)
exposed. c) Hand tighten nut. d) Rinse out
bottle. You can use the collapsible bottles
for developers, they will extend chemical
life because there is no air interface.

Use the marker pen to label each bottle and
lid with the chemical it contains. Cut a
piece of clear flexible tubing long enough
to run from the bottle to the back of the
machine. RUN THE TUBING STRAIGHT
DOWN from the back of the machine. After about a foot, the tubing can run in any
direction Allow about 2 feet (60 cm.) extra for slack. Label both ends of the tubing with
the chemical name. Slip one end over the proper tube and the other end over the
exposed black tubing of the solution bottle. The 5 gal. water bottle connects to the
WATER (#5) tube.

IMPORTANT.  The solution source bottles must be located below the processor.

The 5 gal. water bottle, which
has a float valve near its lid,
holds the water that will be
used for processing and
internal cleaning (FLUSHING)
of the unit. You can manually
fill the bottle. Use regular tap
water, not  de-ionized or
distilled water. You can
connect the bottle to a cold
water pipe for automatic filling
with the “ice maker” kit. TURN
OFF THE WATER AT THE
SOURCE WHEN THE MACHINE
IS NOT IN USE. 

The DUMP bottle comes with a
level sensor that should be plugged into the DUMP SENSOR jack on the back of the unit.
IT WILL SENSE IF YOU HAVE ENOUGH ROOM FOR A 2 or 4 ROLL RUN ONLY. The bottle
must be emptied if you are doing a 6 or 8 roll run. If a plumbed-in drain is available, use
it.

Содержание SK-8RG

Страница 1: ...4 Processing 10 Push processing 5 Drying 10 Disc processing 6 Reel loading 11 4x5 processing 7 Special functions 12 Automatic replenishing 7 Maintenance 15 Service 8 Alarms and messages 18 Parts list...

Страница 2: ...sses are pre programmed but the developer time can be easily changed when desired The SK 8RG protects the film from possible operator errors It has an interactive computerized display that prompts and...

Страница 3: ...can run in any direction Allow about 2 feet 60 cm extra for slack Label both ends of the tubing with the chemical name Slip one end over the proper tube and the other end over the exposed black tubing...

Страница 4: ...close to unit Fig 1 Run tubing directly to DUMP bottle Fig 1 Cut off unneeded length of dump tubing Fig 1 Run the DUMP and the FLUSH tubing separately into the 3 gray fitting on the DUMP bottle Do not...

Страница 5: ...ols the warm air blowing on the DRUM This fine tunes the solution to an accurate temperature for very consistent results When one solution is finished it is drained out and the prepared solution in th...

Страница 6: ...y Paterson tm reels will work They are available at most photo stores Contact Photo Therm if you prefer to use different style reels 35 MM FILM Cut off the film leader Clip the corners of the leading...

Страница 7: ...d but not touching the bottom of the heat tank A glass or dial thermometer will not work The temperature can be adjusted with a small screwdriver through a hole on the left side of the unit Clockwise...

Страница 8: ...NOT TURN UNIT OFF until you check why A continuous series of short buzzes signals that the unit requires attention Read the message in the display to find out what needs to be done Check Dev etc mean...

Страница 9: ...tone Run for at least 2 hours a day The bleach is SAVED in this process because of its cost If you wish to save a different chemical let us know Check reversal for scum growth discard clean bottle re...

Страница 10: ...plastic and process normally DISC DRYING When the processor says INSERT PLUG push the disc dryer assembly into the coupling as if it was a normal processing DRUM Insert the cord from the dryer into t...

Страница 11: ...other hand to help guide the sheets After all the sheets have been loaded rotate the stainless clips toward the outside ring to hold in the sheets The spindle should then be inserted from the bottom o...

Страница 12: ...nishment rate The REPLENISHING BOTTLE contains both the used solution and the fresh replenisher solution The replenishing solution is held in the internal BLADDER which equalizes solution heights for...

Страница 13: ...13...

Страница 14: ...a red tinge increase the bleach replenishment rate and or make sure the bleach is aerated You can usually re bleach the film to correct the problem CALIBRATING THE METERING VALVE If you wish to check...

Страница 15: ...ing while the spindle is being pulled in Adjust by mounting the STAPLE closer to the motor Machine failure message Temperature sensor problem Check ribbon connector from heat tank Make sure it is push...

Страница 16: ...16...

Страница 17: ...he clamp With a paper towel in hand remove the SV tubing from the pump fitting Remove the ribbon connector of the SV from the PC board Carefully lift the connector straight up Do not bend the pins The...

Страница 18: ...and wipe up any loose solutions Tie down the 2 pumps through the holes in the base with strong twine Remove the magnetic stirrer white pill from inside the heat chamber Close the unit Remove and keep...

Страница 19: ...19 blank sheet for page count insert wiring diagram...

Страница 20: ...553 2001 Porters Get catalog Has Rexton Hyperwet 35 0597 a B W rinse 708 833 0300 McMasters Ask for catalog Has silicone grease 1418K4 800 537 9724 United Plastics Ask for catalog Good source for bot...

Отзывы: