Sidekick SK-8RG Скачать руководство пользователя страница 14

14

AUTOMATIC  REPLENISHING cont.

Use a small funnel to pour in about 2 liters of solution through the RETURN fitting.

Pour a liter of REPLENISHER into the BLADDER. Check the BLADDER periodically, if it is
closing in, add more replenisher.

Place a container under the OVERFLOW fitting to catch the overflow.

SETTING THE CONTROL KNOB

Turn the knob clockwise to get to starting position. Do not overtighten.

BLEACH. Turn the knob 3/4 turn (5ml./roll) as a starting setting.

FIX. Turn the knob 3 turns (30 ml./roll) as a starting setting.

Monitor your process results. If the film does not clear (milky) increase the replenishment
rate. You can usually re-fix the film manually to correct the problem.

If the film looks flat, muddy or the black areas have a red tinge, increase the bleach
replenishment rate and/or make sure the bleach is aerated. You can usually re-bleach the
film to correct the problem.

CALIBRATING THE METERING VALVE

If you wish to check how much replenisher is actually drawn in per roll, do the following:
1. Run tubing from the USED tube of the METERING VALVE to a container of water at
floor level.
2. Run tubing from the REPLENISH tube of the METERING VALVE to a beaker of water.
The top of the water level in the beaker must be at the same level as the water in the
container.
3. Mount the METERING VALVE on the water input (#5) tube of the selector valve.
4. Turn on SIDEKICK. Select TEMPERATURE CALIBRATE, push START. The unit will
pump water into the heating tank to the 8 roll level.
5. When the unit stops pumping, turn it off. Measure how much water was pulled from the
beaker. Divide by 8 to get volume per roll.
6. Turn SIDEKICK on and do DRAIN to empty the heating tank.

Содержание SK-8RG

Страница 1: ...4 Processing 10 Push processing 5 Drying 10 Disc processing 6 Reel loading 11 4x5 processing 7 Special functions 12 Automatic replenishing 7 Maintenance 15 Service 8 Alarms and messages 18 Parts list...

Страница 2: ...sses are pre programmed but the developer time can be easily changed when desired The SK 8RG protects the film from possible operator errors It has an interactive computerized display that prompts and...

Страница 3: ...can run in any direction Allow about 2 feet 60 cm extra for slack Label both ends of the tubing with the chemical name Slip one end over the proper tube and the other end over the exposed black tubing...

Страница 4: ...close to unit Fig 1 Run tubing directly to DUMP bottle Fig 1 Cut off unneeded length of dump tubing Fig 1 Run the DUMP and the FLUSH tubing separately into the 3 gray fitting on the DUMP bottle Do not...

Страница 5: ...ols the warm air blowing on the DRUM This fine tunes the solution to an accurate temperature for very consistent results When one solution is finished it is drained out and the prepared solution in th...

Страница 6: ...y Paterson tm reels will work They are available at most photo stores Contact Photo Therm if you prefer to use different style reels 35 MM FILM Cut off the film leader Clip the corners of the leading...

Страница 7: ...d but not touching the bottom of the heat tank A glass or dial thermometer will not work The temperature can be adjusted with a small screwdriver through a hole on the left side of the unit Clockwise...

Страница 8: ...NOT TURN UNIT OFF until you check why A continuous series of short buzzes signals that the unit requires attention Read the message in the display to find out what needs to be done Check Dev etc mean...

Страница 9: ...tone Run for at least 2 hours a day The bleach is SAVED in this process because of its cost If you wish to save a different chemical let us know Check reversal for scum growth discard clean bottle re...

Страница 10: ...plastic and process normally DISC DRYING When the processor says INSERT PLUG push the disc dryer assembly into the coupling as if it was a normal processing DRUM Insert the cord from the dryer into t...

Страница 11: ...other hand to help guide the sheets After all the sheets have been loaded rotate the stainless clips toward the outside ring to hold in the sheets The spindle should then be inserted from the bottom o...

Страница 12: ...nishment rate The REPLENISHING BOTTLE contains both the used solution and the fresh replenisher solution The replenishing solution is held in the internal BLADDER which equalizes solution heights for...

Страница 13: ...13...

Страница 14: ...a red tinge increase the bleach replenishment rate and or make sure the bleach is aerated You can usually re bleach the film to correct the problem CALIBRATING THE METERING VALVE If you wish to check...

Страница 15: ...ing while the spindle is being pulled in Adjust by mounting the STAPLE closer to the motor Machine failure message Temperature sensor problem Check ribbon connector from heat tank Make sure it is push...

Страница 16: ...16...

Страница 17: ...he clamp With a paper towel in hand remove the SV tubing from the pump fitting Remove the ribbon connector of the SV from the PC board Carefully lift the connector straight up Do not bend the pins The...

Страница 18: ...and wipe up any loose solutions Tie down the 2 pumps through the holes in the base with strong twine Remove the magnetic stirrer white pill from inside the heat chamber Close the unit Remove and keep...

Страница 19: ...19 blank sheet for page count insert wiring diagram...

Страница 20: ...553 2001 Porters Get catalog Has Rexton Hyperwet 35 0597 a B W rinse 708 833 0300 McMasters Ask for catalog Has silicone grease 1418K4 800 537 9724 United Plastics Ask for catalog Good source for bot...

Отзывы: