Sidekick SK-8RG Скачать руководство пользователя страница 6

6

REEL LOADING

The plastic ratcheting reels can be adjusted to hold different sizes of film. Simply hold
the reel in both hands, making sure that the outer spiral groove (near the ball bearings) is
on top and facing you.

Twist the right half of the reel clockwise until you hear a click. The two halves can then
be pulled apart. There are 3 “keyed” positions on the reel hub. The narrowest position is
for 35mm or 126, the second for 127, and the widest for 120/220.

Insert the leading end of the film, emulsion down, into the outer spiral groove of the reel
and a few inches past the ball bearings. With both hands on the reel twist the right half
and the left half in opposite directions. You may have to assist the film feeding by placing
the thumb, of your forward moving hand, on the outside of the film.

Keep feeding the film until the end clears the ball bearings.

Any Paterson 

tm

 reels will work. They are available at most photo stores. Contact Photo-

Therm if you prefer to use different style reels.

35 MM FILM  Cut off the film leader. Clip the corners of the leading end to make feeding
easier. Cut a “V” into the leading end as shown in sketch. 35 mm film can be started in
the light, but must be fed into the reel in the dark. When you reach the end of the film use
scissors to cut it away from the film cassette. Do not tear the film. An uneven tear may
cause the film to come off the reel.

120/220 FILM.  Separate the tape from the backing paper and fold it back over the film.
This will stiffen the end of the film. Load the taped end into the reel. Feed until the back
end is passes the ball bearings.

Bend the 120 Film Clamp and place it over the end of the film into the grooves of the reel,
close to the ball bearings, as shown above. Add a second film clamp on top of the first
one. For extra assurance use a 1 in. piece of leader tape to bond the end of the film to
the film clamp.

Mount the 120 reels in the center of the spindle.

Содержание SK-8RG

Страница 1: ...4 Processing 10 Push processing 5 Drying 10 Disc processing 6 Reel loading 11 4x5 processing 7 Special functions 12 Automatic replenishing 7 Maintenance 15 Service 8 Alarms and messages 18 Parts list...

Страница 2: ...sses are pre programmed but the developer time can be easily changed when desired The SK 8RG protects the film from possible operator errors It has an interactive computerized display that prompts and...

Страница 3: ...can run in any direction Allow about 2 feet 60 cm extra for slack Label both ends of the tubing with the chemical name Slip one end over the proper tube and the other end over the exposed black tubing...

Страница 4: ...close to unit Fig 1 Run tubing directly to DUMP bottle Fig 1 Cut off unneeded length of dump tubing Fig 1 Run the DUMP and the FLUSH tubing separately into the 3 gray fitting on the DUMP bottle Do not...

Страница 5: ...ols the warm air blowing on the DRUM This fine tunes the solution to an accurate temperature for very consistent results When one solution is finished it is drained out and the prepared solution in th...

Страница 6: ...y Paterson tm reels will work They are available at most photo stores Contact Photo Therm if you prefer to use different style reels 35 MM FILM Cut off the film leader Clip the corners of the leading...

Страница 7: ...d but not touching the bottom of the heat tank A glass or dial thermometer will not work The temperature can be adjusted with a small screwdriver through a hole on the left side of the unit Clockwise...

Страница 8: ...NOT TURN UNIT OFF until you check why A continuous series of short buzzes signals that the unit requires attention Read the message in the display to find out what needs to be done Check Dev etc mean...

Страница 9: ...tone Run for at least 2 hours a day The bleach is SAVED in this process because of its cost If you wish to save a different chemical let us know Check reversal for scum growth discard clean bottle re...

Страница 10: ...plastic and process normally DISC DRYING When the processor says INSERT PLUG push the disc dryer assembly into the coupling as if it was a normal processing DRUM Insert the cord from the dryer into t...

Страница 11: ...other hand to help guide the sheets After all the sheets have been loaded rotate the stainless clips toward the outside ring to hold in the sheets The spindle should then be inserted from the bottom o...

Страница 12: ...nishment rate The REPLENISHING BOTTLE contains both the used solution and the fresh replenisher solution The replenishing solution is held in the internal BLADDER which equalizes solution heights for...

Страница 13: ...13...

Страница 14: ...a red tinge increase the bleach replenishment rate and or make sure the bleach is aerated You can usually re bleach the film to correct the problem CALIBRATING THE METERING VALVE If you wish to check...

Страница 15: ...ing while the spindle is being pulled in Adjust by mounting the STAPLE closer to the motor Machine failure message Temperature sensor problem Check ribbon connector from heat tank Make sure it is push...

Страница 16: ...16...

Страница 17: ...he clamp With a paper towel in hand remove the SV tubing from the pump fitting Remove the ribbon connector of the SV from the PC board Carefully lift the connector straight up Do not bend the pins The...

Страница 18: ...and wipe up any loose solutions Tie down the 2 pumps through the holes in the base with strong twine Remove the magnetic stirrer white pill from inside the heat chamber Close the unit Remove and keep...

Страница 19: ...19 blank sheet for page count insert wiring diagram...

Страница 20: ...553 2001 Porters Get catalog Has Rexton Hyperwet 35 0597 a B W rinse 708 833 0300 McMasters Ask for catalog Has silicone grease 1418K4 800 537 9724 United Plastics Ask for catalog Good source for bot...

Отзывы: