Operating Instructions
LMS1xx Laser Measurement Sensors
For your safety
8012471/ZN27/2017-06-09
© SICK AG · Germany · All rights reserved · Subject to change without notice
15
Chapter
2
2.7.2
Electrical installation work
Only authorized specialists are allowed to perform the skilled electrical installation
work.
Only make and disconnect electrical connections when the device is electrically
isolated.
Select and implement wire cross-sections and their correct fuse protection as per the
applicable standards.
Do not open the housing.
Observe the current safety regulations when working on electrical systems.
2.8
Quick stop and Quick restart
2.8.1
Switching off the LMS1xx
LMS10x/LMS12x/LMS17x:
Switch off voltage supply (power supply unit)
LMS11x/LMS13x/LMS14x/LMS15x/LMS18x as well as LMC12x/LMC13x:
Switch off voltage supply (supply unit) or disconnect the M12 supply cable on the
device.
The LMS1xx retains configurations parameters stored in the internal, non-volatile memory.
Measured values on the data interface are lost.
2.8.2
Switching back on the LMS1xx
LMS10x/LMS12x/LMS17x:
Switch on voltage supply (power supply unit)
LMS11x/LMS13x/LMS14x/LMS15x/LMS18x as well as LMC12x/LMC13x:
Switch on voltage supply (supply unit) or re-connect the M12 supply cable on the device.
The LMS1xx re-commences operation with the configurations parameters last saved.