40
FLOWSIC200 · Operating Instructions · 8013271/1CJ9/V2-0/2022-01 · © SICK Engineering GmbH
Assembly and installation
Fig. 23
Permissible horizontal swivel range
In exceptional cases, both sender/receiver units can be installed tilted downwards by up to
5
°
The sender/receiver units can be aligned in 2 steps:
1
Rough alignment with aid (string or similar) or by sight
2
Fine adjustment with laser pointer or similar.
3.2.5
Installing the junction box
Install this component on a level surface (tunnel wall or roof) as shown in
. For
fastening, the respective suitable mounting kits can be used according to
(drill hole measurements and fitting
Fig. 24
Junction box installation dimensions
< 1
°
Clearance for cable
> 150
> 150
(80)
52
M4
11
3
(125)
Clearance for cable
> 150
> 150
(150)
132
17
6
Aluminium housing
Stainless steel housing
M 8
Содержание FLOWSIC200
Страница 1: ...O PERATING INSTRU CTIO NS FLOWSIC200 Flow Velocity Monitor Installation Operation Maintenance...
Страница 30: ...30 FLOWSIC200 Operating Instructions 8013271 1CJ9 V2 0 2022 01 SICK Engineering GmbH Product description...
Страница 100: ...100 FLOWSIC200 Operating Instructions 8013271 1CJ9 V2 0 2022 01 SICK Engineering GmbH Commissioning and parameterization...
Страница 104: ...104 FLOWSIC200 Operating Instructions 8013271 1CJ9 V2 0 2022 01 SICK Engineering GmbH Maintenance...
Страница 121: ...Specification FLOWSIC200 Operating Instructions 8013271 1CJ9 V2 0 2022 01 SICK Engineering GmbH 121...