Assembly and installation
3.1
Project planning
3.1.1
Planning steps
Plan the following before starting assembly and installation work:
Determine measuring location(s).
Select system components according to
meeting the conditions of use and
customer requirements.
Define installation locations for sender/receiver units, MCU and junction boxes.
Plan power supply.
3.1.2
Requirements for the installation location for the sender/receiver units
The master and slave sender/receiver units must be installed on opposite tunnel walls at a
sufficient height above the road surface, offset to the side (
). The angle between
the measuring axis and tunnel axis should not be significantly greater than 60
°
(minimum
value 45
°
).
Fig. 12
Installation location for sender/receiver units
45 ... 60
°
Me
as
uri
ng
di
sta
nc
e
Max. permissible
vehicle height
Max. 5
°
> 0.5 m
> 2 m
Clearance
Tunnel wall
Sender/receiver unit, Master
Sender/receiver unit, Slave
Flow direction
Содержание FLOWSIC200
Страница 1: ...O PERATING INSTRU CTIO NS FLOWSIC200 Flow Velocity Monitor Installation Operation Maintenance...
Страница 30: ...30 FLOWSIC200 Operating Instructions 8013271 1CJ9 V2 0 2022 01 SICK Engineering GmbH Product description...
Страница 100: ...100 FLOWSIC200 Operating Instructions 8013271 1CJ9 V2 0 2022 01 SICK Engineering GmbH Commissioning and parameterization...
Страница 104: ...104 FLOWSIC200 Operating Instructions 8013271 1CJ9 V2 0 2022 01 SICK Engineering GmbH Maintenance...
Страница 121: ...Specification FLOWSIC200 Operating Instructions 8013271 1CJ9 V2 0 2022 01 SICK Engineering GmbH 121...