O P E R A T I N G I N S T R U C T I O N S | DUSTHUNTER SP100
Subject to change without notice
ASSEMBLY AND INSTALLATION
3
3.2
Assembly
Carry out all assembly work onsite. This includes:
▸
Fitting the flange with tube
▸
Fitting the MCU control unit,
▸
Fitting the optional external purge air unit.
3.2.1
Fitting the flange with tube
Fig. 14: Fitting the flange with tube (standard version is shown)
WARNING:
▸
Observe the relevant safety regulations as well as the safety notices during
all work:
see “Important Information”, page 7
▸
Consider the equipment weight specifications when planning the mounting
brackets.
▸
Only carry out assembly work on equipment with hazard potential (hot or
aggressive gases, higher internal duct pressure) when the equipment is at a
standstill.
▸
Take suitable protection measures against possible local hazards or hazards
arising from the equipment.
All dimensions specified in this Section are shown in mm.
NOTE:
The tube length must suit the planned sender/receiver unit depending on the
relation between gas temperature and nominal length (
).
!
▸
Do not shorten tubes.
●
Dimension a must be large enough so that a weatherproof cover can be fitted easily
when necessary (approx. 40 mm).
●
Dimension b must be as large as possible under consideration of dimension a.
TOP
A
A
A
A
b
a
Approx.
1
°
D
Nominal length of sender/receiver unit
D
435 mm, 735 mm
Ø 76
1035 mm, 1335 mm
Ø 127
Marking for assembly position
Assembly on brick stack
Assembly on thin-walled duct
Assembly on steel duct
Junction plate
Anchor plate
Duct wall
Fixing bolt for weatherproof cover
Flange with tube