MAINTENANCE AND REPAIR
9
85
8027513/V1-0/2022-03|SICK
Subject to change without notice
O P E R A T I N G I N S T R U C T I O N S | MDA Vision
9
Maintenance and repair
9.1
Maintenance intervals
Maintenance and repair measures may only be carried out by qualified persons.
•
Qualified persons have the specialist training, skills, experience and knowledge of
the relevant regulations and standards needed to be able to perform work assigned
to them and to identify and avoid any potential dangers independently.
•
Electricians have the professional training, skills, experience and knowledge of the
relevant standards and provisions needed to work on electrical systems and to detect
and avoid any potential dangers independently.
Device
Maintenance task
Interval*
Type
Visionary-S
Clean the front screen
1x/month
Trained personnel
Lector6xx
Clean the front screen
1x/month
Trained personnel
Color camera
Clean the front screen
1x/month
Trained personnel
Scale
Visual monitoring for contamination
Daily
Trained personnel
General
information
Visual monitoring for contamination
Daily
Trained personnel
Control measurements with test objects to check
the measurement accuracy of the multi-dimensional
measurement system
Whenever
the system
is started
Trained personnel
Visual electrical cabling check and as well as visual
inspection of wiring for damage
1x/year
Trained personnel
* The intervals depend on the ambient conditions and degree of contamination. In addition, the intervals must be defined
according to how important they are for the customer process.
Tab. 1: Maintenance intervals