background image

ACL 300B Operation Manual 

Rev. 6/9/10 KCB 

Page 1 of 5 

ACL 300B Precision Static Locator 

OPERATION MANUAL 

Meter is warranted for one year from the date of purchase on parts and labor. 

Calibration is recommended every twelve months. 

www.

.com

[email protected]

1.800.561.8187

Summary of Contents for ACL 300B

Page 1: ...10 KCB Page 1 of 5 ACL 300B Precision Static Locator OPERATION MANUAL Meter is warranted for one year from the date of purchase on parts and labor Calibration is recommended every twelve months www com information itm com 1 800 561 8187 ...

Page 2: ...arge relative to the sensitive electrode We refer to these relative sizes in our Field of View graph as Aspect Ratio OPERATION 1 Test meter before using following instructions on p 3 of this manual 2 Turn the meter on by pushing the red power range selector switch is into the LO or the HI position 3 Discharge static electricity from your body by touching a grounded metal object such as a water pip...

Page 3: ...n not in use by returning red switch to middle position 8 Remove the battery when storing the instrument for extended periods of time BATTERY REPLACEMENT To check battery press black BATT ZERO switch to left toward BATT side The needle should move to the right of the red battery line If it does not battery replacement is needed The battery should be replaced after forty hours of use or at least on...

Page 4: ...plastic 2 Rub balloon or plastic vigorously on arm 3 Using free hand press red switch on ACL 300B to the left in LO position 4 Pointing ACL 300B away from balloon or other charged objects press black BATT ZERO switch twice to the right to zero meter 5 Bring balloon toward meter s silver conductive sensor plate Needle should move freely to extreme right or left Caution DO NOT TOUCH BALLOON TO SENSO...

Page 5: ...ate and the case of the ACL 300B to the low side of the Reference Supply or ground 2 Position the unit under test so that its electrode is from the plate s center 3 Mechanically zero the meter 4 Turn the unit on to LO 5 Press the zero switch two or three times and the meter should zero 6 Apply 450V DC to the test plate from the Reference Supply 7 The meter of the unit under test should read betwee...

Reviews: