UK
Operator’s manual
63
3
4
UNPACKING
After removing the packaging make sure that the equipment’s various components are
undamaged, by checking that there are no visibly damaged parts (control unit, lift struc-
ture). In case of damage
do not use the equipment (the lift)
and contact professionally
qualified staff (your dealer).
The packaging materials (plastic bags, expanded polystyrene, nails, screws, pieces of
wood, etc....) must not be left within reach of children since they are potential sources
of danger.
Consign these materials to the specific collection centres if they are pollutant or not
biodegradable.
INSTALLATION AREA
The machine installation requires a usable space of min. 4,060 x 7,760 mm (fig.5).
From the control position the operator has a clear view of the entire lift and the surround-
ing area. The operator must not let any unauthorised person enter this area, and must
ensure that it is clear of potentially hazardous objects.
Do not install on loose or unstable surfaces.
The surface on which the lift is installed must withstand the loads transmitted during
operation.
This surface must have a capacity of at least 25 kg/cm
2
and a resistance class of
250R’bk.
The lift contact zones to the floor must be levelled.
Содержание PSR 43 CT LT
Страница 14: ...68 Operator smanual 8_1...
Страница 31: ...UK Operator smanual 85 YV6 A PM B1 YV5 B2 YV3 YV4 17 YV4 YV3...
Страница 41: ...UK Operator smanual 95 19 1 5 3 2 4 YV9 YV6...
Страница 43: ...UK Operator smanual 97 19_1...
Страница 45: ...UK Operator smanual 99 YV12 VCP1 YV8 CIL LT DX YV7 CIL LT SX VCP2 YV10 YV11 20...
Страница 47: ...UK Operator smanual 101 20_1 YV12 VCP1 VCP2 YV7 YV8 CIL LT SX CIL LT DX YV10 YV11 YV13...
Страница 49: ...UK Operator smanual 103 21...
Страница 50: ...104 Operator smanual 21_1...
Страница 51: ...UK Operator smanual 105 21_2...
Страница 54: ...108 Operator smanual Notes...