UK
Operator’s manual
67
Hydraulic system connection
Proceed as follows to connect the lift hydraulically to the control unit:
1. Remove the control unit door by unscrewing the 4 fixing screws
2. Remove the protective cover
3. Extract the hydraulic pipes under the main lift runways.
4. Remove the hydraulic plugs from the hydraulic control unit unions.
5. Connect the hydraulic lines to the control unit, matching the numbers on the lines
correctly with the numbers indicated in figure 8, and tightening correctly.
6. Connect the fluid recovery lines R (figure 8_1).
N.B.: When all the pipes R have been connected, open the cock A (fig.8_1).
8
A
AT
B
BT
Содержание PSR 43 CT LT
Страница 14: ...68 Operator smanual 8_1...
Страница 31: ...UK Operator smanual 85 YV6 A PM B1 YV5 B2 YV3 YV4 17 YV4 YV3...
Страница 41: ...UK Operator smanual 95 19 1 5 3 2 4 YV9 YV6...
Страница 43: ...UK Operator smanual 97 19_1...
Страница 45: ...UK Operator smanual 99 YV12 VCP1 YV8 CIL LT DX YV7 CIL LT SX VCP2 YV10 YV11 20...
Страница 47: ...UK Operator smanual 101 20_1 YV12 VCP1 VCP2 YV7 YV8 CIL LT SX CIL LT DX YV10 YV11 YV13...
Страница 49: ...UK Operator smanual 103 21...
Страница 50: ...104 Operator smanual 21_1...
Страница 51: ...UK Operator smanual 105 21_2...
Страница 54: ...108 Operator smanual Notes...